7 BBL Insulated Hybrid Brewhouse V1
© Blichmann Engineering, LLC 2018
For replacement parts, visit: blichmannengineering.com/genuine-replacement-parts
4
Control Panel Installation
Warning:
Always follow ALL local codes and regulations for installation of this panel. We highly recommend hiring a certified electrician for this work!
This panel is designed for 208v or 230v three phase power only. (Single phase options are availible)
The back of the panel has 4 holes for affixing the panel to the wall of the brewhouse or onto a suitable stand. Mounting hardware or stand is not
included. The image below indicates the locations of the main components.
We recommend mounting the bottom of the panel 3 feet from the ground.
DC Control Power Supply
Main GFI Breaker
Heating Element Breakers
Heating Element Contactors
Main Power GFI Breaker
– This industrial grade GFI (ground fault interrupting) breaker is the connection point for main power cables connected to the
panel. Consult your local codes to determine if you can utilize this breaker as a main disconnect as well. In any case, we highly recommend a suitable
disconnect switch be installed prior to the panel for safe servicing of the panel. Your contractor will need to punch a hole in your panel for the main
power cable conduit in your desired location. Power demand for the brewhouse is 215A at 208V (three phase) or 100A at 480V (three phase). Select
a main breaker setting for 20% above the appropriate amperage to avoid nuisance tripping or as directed by your local codes.
Panel Dimensions
36 inches tall
30 inches Wide
11 inches Deep
RTD and Low Level Float
Switch Terminal Block
Mash Paddle VFD
Terminal Block
THREE PHASE