7 BBL Insulated Hybrid Brewhouse V1
© Blichmann Engineering, LLC 2018
For replacement parts, visit: blichmannengineering.com/genuine-replacement-parts
1
7 BBL Insulated Hybrid Brewhouse
Assembly, Operation, & Maintenance
Congratulations on your purchase, and thank you for selecting the 7 BBL Hybrid
Brewhouse from Blichmann Engineering™. We are confident that it will provide you
years of service and many gallons of outstanding beer. This manual will familiarize
you with the use, assembly, and the sanitation procedures for the product.
Sections labeled “Warning” can lead to serious injury or death if not followed. Please thoroughly read these sections
and understand them completely before use. If you do not understand them or have any questions, contact your
retailer or Blichmann Engineering (www.BlichmannEngineering.com) before use.
Sections labeled “Caution” can lead to equipment damage or unsatisfactory performance of the equipment. Please
read these sections thoroughly. If you have any questions, contact your retailer or Blichmann Engineering
(www.BlichmannEngineering.com) before use.
Sections labeled “Important” should specifically be followed to ensure satisfactory results with the product.
WARNING:
CAUTION:
IMPORTANT:
IMPORTANT INFORMATION
PLEASE READ AND THOROUGHLY UNDERSTAND THIS MANUAL PRIOR TO USE
FOR IMPORTANT SAFETY INFORMATION!
What’s In the Box?
Item Number
Description
Quantity
BEPS-BK-7BBL
7 BBL Boil Kettle
1
BEPS-HLT-7BBL
7 BBL Hot Liquor Tank
1
BEPS-MLT-7BBL
7 BBL Mash Tun with Mash Rake and Motor 1
Control Panel
1
Sanitary Heater Set of 3
2
BE-000861-00
2.5” Tri Clamp
3
BEPS-Pump-1HP
1HP Brewery Pump
2
BEPS-CHILLER-2.0SQM Heat Exchanger
1
BEPS-HoseKit-5
5 Hose Assembly Kit
1
BE-000957-00
CIP Spear 1.5” Tri Clamp
1
BE-000859-00
Cap 2.5” Sanitary
3
Item Number
Description
Quantity
BE-000868-00
Clamp Gasket 1.5”
17
BE-000633-00
1.5” Tri Clamp
17
BE-000863-00
Tri Clamp Elbow 1.5”
6
BE-001356-00
1.5” Multi Position Valve Tri Clamp
5
BE-001084-00
CIP Spray Ball
1
BE-001186-00
1.5” Sanitary Pipe 6”
1
BE-000630-00
Cap 1” & 1.5” Sanitary
2
BE-001479-00
6” Gasket
1
BE-000866-00
Clamp Gasket 2.5”
3
BE-001482-00
6” Tri Clamp Cap
1
BE-001478-00
6” Tri Clamp
1
IMPORTANT: Power demand for the brewhouse is 215A at 208V (three phase), 100A at 480V (three phase) or 310A at 240V (single phase).
Select a main breaker setting for 20% above the appropriate amperage to avoid nuisance tripping or as directed by your local codes.