
99
First Line and Planned Maintenance Manual
Frontline Sirius®
A Cover
B Bellows
C Pop-off Valve
D Valve Seat
E Bellows Base
F Fixing Screws
G O-ring
Figure 12 Bellows Assembly
•
Check that the Pop-off valve does not leak by inverting the whole assembly, the block,
22mm inlet and turn the assembly until it is the correct way up.
•
The bellows should not fall (it may drop 1-2cm but it should hold steady at that point).
•
Refit bellows to the locating pins on the Sirius.
•
Refit the fixing screws
F
G
E
B
A
C
D
7. Fitting Planned Maintenance Kits
Summary of Contents for Sirius 1000
Page 17: ...16 First Line and Planned Maintenance Manual Frontline Sirius Notes ...
Page 27: ...26 First Line and Planned Maintenance Manual Frontline Sirius Notes 1 Technical Description ...
Page 37: ...36 First Line and Planned Maintenance Manual Frontline Sirius Notes 2 User Pre Use Testing ...
Page 61: ...60 First Line and Planned Maintenance Manual Frontline Sirius Notes 3 Full System Testing ...
Page 62: ...61 First Line and Planned Maintenance Manual Frontline Sirius 4 0 Maintenance 4 Maintenance ...
Page 71: ...70 First Line and Planned Maintenance Manual Frontline Sirius Notes 5 Routine Maintenance ...
Page 106: ...105 First Line and Planned Maintenance Manual Frontline Sirius 8 0 Spare Parts 8 Spare Parts ...