180-CL2118-SP v1.00
May 22, 2018
Page 23
Clarity CL2118 SP
INSTALLATION
OPTIONAL BLOWER INSTALLATION FOR
EXISTING CL2118 INSTALLATION
1. If attached, unscrew junction box coverplate from
inside. (2 screws)
2. Run the black and white wires from the blower
through the end strain relief of the junction box.
Connect the black to black and white to white wires
with marrettes.
24” wht
5” blk
3. Coil the wires inside the junction box and refasten
the cover plate.