OM-APEX E V1.06
November 19, 2012
Page 8
APEX CBT
SAFETY PRECAUTIONS
•
Installation is to be performed by a qualifi ed installer
•
Comply with all local codes and regulations.
•
Never operate a furnace that has been improperly installed.
•
DO NOT USE CHEMICALS OR FLUIDS TO START OR FRESHEN A FIRE.
Keep all fl ammable
fl uids well away from the furnace.
•
RISK OF FIRE OR EXPLOSION - DO NOT BURN GARBAGE, GASOLINE, NAPHTHA, ENGINE
OIL, OR OTHER INAPPROPRIATE MATERIALS.
•
Combustible materials, including fi re wood, must not be stored within the furnace installation
clearances or within the space required for fueling, ash removal, and other routine maintenance
operations.
•
Never operate the furnace unless you are sure the smoke pipe and chimney are in safe condition.
Flue gasses may contain carbon monoxide which is poisonous.
•
Keep smoke pipe and chimney clean to prevent a chimney fi re. Inspect and clean fl ues and
chimney regularly. In the event of a chimney fi re turn down all thermostats and close off
combustion air. Call a fi re department if necessary. Have a clearly understood plan to handle a
chimney fi re.
•
CAUTION: CLEANOUT OF THE HEAT EXCHANGER, FLUE PIPE, CHIMNEY, AND DRAFT
INDUCER IF USED, IS ESPECIALLY IMPORTANT AT THE END OF THE HEATING SEASON
TO MINIMIZE CORROSION DURING THE SUMMER MONTHS, CAUSED BY ACCUMULATED
ASH.
•
CAUTON: Hot Surfaces
- Keep children away.
- Do not touch during operation.
- Maximum draft marked on nameplate.
Summary of Contents for APEX CBT
Page 5: ...OM APEX E V1 06 November 19 2012 Page 5 APEX CBT APPLIANCE DIMENSIONS ...
Page 7: ...OM APEX E V1 06 November 19 2012 Page 7 APEX CBT CERTIFICATION LABEL ...
Page 33: ...OM APEX E V1 06 November 19 2012 Page 33 APEX CBT BRICK LAYOUT ...
Page 40: ...OM APEX E V1 06 November 19 2012 Page 40 APEX CBT NOTES ...