![Blaze King APEX CBT Operation & Installation Manual Download Page 12](http://html.mh-extra.com/html/blaze-king/apex-cbt/apex-cbt_operation-and-installation-manual_2772261012.webp)
OM-APEX E V1.06
November 19, 2012
Page 12
APEX CBT
INSTALLATION INSTRUCTIONS cont.
MP80
HOT AIR TO HOUSE
ALTERNATE
HOT AIR
PLENUM
GAS, OIL
ELECTRIC
UP FLOW
FURNACE
EXISTING
MP80
RETURN
AIR
PLENUM
HOT AIR SUPPLY
PLENUM
COUNTER/
FLOW GAS
ELECTRIC
OR OIL
TYPICAL ADD ON SYSTEM
LAYOUT
WOOD COUNTERFLOW
INSTALLATION REQUIRES
NOTE
IN THIS CONFIGURATION
SPECIAL CLEARANCES APPLY
SEE CF6KIT INSTRUCTIONS.
DO NOT INSTALL IN THIS
CONFIGURATION WITHOUT
CF6 KIT OPTION
ALTERNATE
HOT AIR
PLENUM
GAS, OIL
ELECTIRC
UP FLOW
FURNACE
HOT AIR TO HOUSE
RETURN
AIR
PLENUM
COUNTER/
FLOW GAS
HOT AIR TO HOUSE
MP80
MP80
ELECTRIC
OR OIL
12
”x 17
”
12
”x 17
”
APEX
CBT
APEX
CBT
APEX
CBT
APEX
CBT
PR
OHIB
IT
ED
35 KIT
WARNING:
Hot air Plenum and
Duct work can only
run Horizontally or Up,
NEVER down.
Fig. 3 Typical installation illustration
Summary of Contents for APEX CBT
Page 5: ...OM APEX E V1 06 November 19 2012 Page 5 APEX CBT APPLIANCE DIMENSIONS ...
Page 7: ...OM APEX E V1 06 November 19 2012 Page 7 APEX CBT CERTIFICATION LABEL ...
Page 33: ...OM APEX E V1 06 November 19 2012 Page 33 APEX CBT BRICK LAYOUT ...
Page 40: ...OM APEX E V1 06 November 19 2012 Page 40 APEX CBT NOTES ...