![Blaze King APEX CBT Operation & Installation Manual Download Page 23](http://html.mh-extra.com/html/blaze-king/apex-cbt/apex-cbt_operation-and-installation-manual_2772261023.webp)
OM-APEX E V1.06
November 19, 2012
Page 23
APEX CBT
INDEPENDENT WOOD FURNACE
When installed with a VB1000 blower cabinet mounted on either side, the APEX CBT becomes an
INDEPENDENT wood only furnace. Th
e blower must have a minimum 900 cfm. capacity (1/3 hp.). In this
confi guration the interlock limit is not used. Figure 23 shows the electrical connections, (use only 1 limit
switch).
Fig. 23 ELECTRICAL CONNECTIONS INDEPENDENT WOOD
INSTALLATION INSTRUCTIONS - Wood only
Summary of Contents for APEX CBT
Page 5: ...OM APEX E V1 06 November 19 2012 Page 5 APEX CBT APPLIANCE DIMENSIONS ...
Page 7: ...OM APEX E V1 06 November 19 2012 Page 7 APEX CBT CERTIFICATION LABEL ...
Page 33: ...OM APEX E V1 06 November 19 2012 Page 33 APEX CBT BRICK LAYOUT ...
Page 40: ...OM APEX E V1 06 November 19 2012 Page 40 APEX CBT NOTES ...