CHAPTER 6: Intrusive Testing
31
Example of Monitoring from a Test Module
In this example, the external test equipment is connected, via a patch cord, to patch module 2’s DCE patch
cavity. This permits the interactive testing of signals passing through patch module 2’s DCE.
Patch-Cord Connection
Shown below is the test patch cord connected to the external test equipment and the patch module 2 DCE
patch cavity.
Figure 6-3. Patch-cord connection.
Test Cord
Test Equipment
TEST
1
2
3
4…
…14
15
16