76
CSU/DSU MS/DBU
Fig. 4-49. Test Options Submenu.
Menu Map
3=CONFIG/1=LOCAL/3=TEST OPTIONS
Operation
Follow standard operating procedures. When 3=TEST OPTIONS is flashing,
press the Enter button. The first of the Test Options submenu items is
displayed.
Continue with standard operating procedures to select menu options. At
the end of the options, the system briefly displays “Command Accepted” and
returns to the active menu.
Submenu 1 Test Timeout
The Test Timeout option is used to specify the length of time a CSU/DSU
MS/DBU remains in a test mode before an automatic return to the data
mode. The LCD display is shown in
Fig. 4-50
.
3=TEST OPTIONS
1=TEST TIMEOUT
2=RDL EN/DIS
3=EIA LLB EN/DIS
4=EIA RLB EN/DIS
ENTER TIMEOUT
(0=OFF) : 00 SEC
1=RDL IGNORED
2=RDL ACCEPTED
1=DISABLED
2=ENABLED
Summary of Contents for CSU/DSU MS/DBU
Page 100: ...99 NOTES ...