11 SPOUT INSTALLATION
Apply PTFE plumbers tape on both ends of Pipe Nipple (
11A
) (not included).
Screw Pipe Nipple (
11A
) into the elbow inside the wall and tighten with pipe
wrench. The Pipe Nipple (
11A
) is to project 3 ⅞” to 4” from the finished wall.
Screw Tub Spout (
11B
) onto Pipe Nipple (
11A
) and tighten until Spout is properly
positioned and flush to the finished wall.
10 SHOWER ARM INSTALLATION
Insert the longer end of Shower Arm (
10A
) through the Shower Flange (
10B
).
Apply PTFE plumber’s tape to both ends of Shower Arm (
10A
) according to
manufacturer’s instructions. Screw the end of Shower Arm (
10A
) into pipe
elbow inside the wall. Slide Shower Flange (
10B
) tight to the wall.
12 UNIT START UP
Turn on hot and cold water supplies, and check all connections for leaks.
13 FLOW FUNCTION
By rotating the Lever Handle (
13A
) counterclockwise, the valve will be activated.
The water flow will increase by continuing to rotate the Lever Handle (
13A
).
14 TUB SPOUT FUNCTION
When the valve is turned on, water normally flows through the Tub Spout (
14A
).
To activate the shower, turn valve on and pull the Knob (
14B
) up. Hold on until
water flows continuously from the shower arm.
15 FINAL FLUSHING
For final flushing, turn valve on and allow water to run through the Tub Spout
(
15A
) for several minutes. Pull Spout Knob (
15B
) up to allow water to run through
Shower Arm (
15C
). Allow water to run for several minutes until all foreign matter
clears the line.
16 SHOWER HEAD INSTALLATION
Thread Shower Head (
16A
) onto Shower Arm (
16B
).
Make sure Shower Head (
16A
) is securely tightened to Shower Arm
(
16B
).
4
11A
3
7
/
8
”
to 4
”
11B
13A
CLOSED
OPEN
15B
14A
14B
UP
For
Shower
15A
15C
16B
16A