Page 4
PARTS LIST
Tools Required: Screwdriver and Drill.
NOTE:
15S = 2 short butterfly screws. Used for installing Support Rails, to L-BP and R-BP
pieces. Must be inserted so that wing is on exterior side of unit.
25S = 14 short butterfly screws. Used for installing Connecting Rails, L-BP and R-BP
pieces to vertical rails. Must be inserted so that wing is on exterior side of unit.
35M = 4 medium butterfly screws. Connects diagonal support rails. Must be inserted
so that wing is on rear of unit.
45L = 6 long butterfly screws. Must be inserted through vertical rail first then
tightened into Reinforcing Bars.
SET UP & USE
25S
25S
25S
15S
25S
25S
25S
25S
15S
Anti-tip Bracket
Connecting Rail
Connecting Rail
Anti-tip Bracket
35M
35M
35M
35M
25S
45L
45L
45L
LF1-1
RF1-1
RB2-1
LB2-1
LF1-2
RF1-2
L-BP
R-BP
RB2-2
LB2-2
L-BP
R-BP
Reinforcing Bar
Reinforcing Bar
Support Rail
Support Rail