Page 9
ENGLISH
TOP RAIL HARDWARE
3/8 ” Screws
(4)
Top Rail
(1)
Fi g.A
R1 hardw are
(2)
R1 hardware
(10 *3/4 *1/12 )
Weather stripping
(5)
Packaging
Top Rail
3/8 Screws
(4)
Top Rail
(1)
Packagin g
Top Rail
(10 *3/4 *1/12 )
Weather stripping
(5)
Fig. A
SET UP & USE
PREPARE THE WINDOW
Lower sash must open sufficiently to allow a clear vertical opening of 13 inches
(330mm). Side louvers and the rear of the AC must have clear air space to allow
enough airflow through the condenser, for heat removal. The rear of the unit must be
outdoors, not inside a building or garage.
PREPARE AIR CONDITIONER
A: Remove the air conditioner from the carton and place on a flat surface. Use 2
people to lift.
B: Remove top rail and from the packaging material as shown in Fig. A.
MOUNTING HARDWARE
TOP RAIL HARDWARE
3/ 4 (or 1/
Screws
(7)
2 )
Lock Frame
(2)
Sash Lock
(1)
Window sash
seal foam
(1)
Loc k Frame
(2)
(For Wooden
windows)
(For Vinyl-Clad
windows)
(on some mode ls)
Summary of Contents for BD05MWT6
Page 2: ...Page 2 ENGLISH ...
Page 20: ...Page 20 FRANÇAIS ...
Page 22: ...Page 22 FRANÇAIS ...
Page 40: ...Page 40 FRANÇAIS ...
Page 42: ...Página 42 ESPAÑOL ...
Page 60: ...ESPAÑOL ...