Ventless Hood System
Installation
14
3. If required, connect the provided fire extinguishing system contacts for remote signaling. Refer to
the electrical diagram included in this manual (see page 26).
4. Adjust the position of the two ADP appliance nozzles as depicted below.
5. Install two UL Listed; type “A”, 165
°
F. fusible links (load rating 3-45 lbs.) in the two appliance
detector positions (one in front of the grease baffle, one behind the grease baffle).
FUSIBLE
LINKS
Summary of Contents for FH-28CT COUNTERTOP
Page 1: ...CS TM 041 01 Revised 04 17 13 Ventless Hood System MODEL FH 28CT COUNTERTOP Service Manual ...
Page 11: ...Ventless Hood System Installation 9 Figure 1 ...
Page 12: ...Ventless Hood System Installation 10 Figure 2 ...
Page 13: ...Ventless Hood System Installation 11 Figure 3 Right Side Pull Station Mounting ...
Page 14: ...Ventless Hood System Installation 12 Figure 4 Left Side Pull Station Mounting ...
Page 15: ...Ventless Hood System Installation 13 Figure 5 Complete Pull Station Mounting ...
Page 24: ...Ventless Hood System Replacement Parts 22 Figure 7 Blower Motor Assembly ...
Page 26: ...Ventless Hood System Replacement Parts 24 Figure 8 Right Side Cabinet Assembly ...
Page 28: ...Ventless Hood System Wiring Diagrams 26 Wiring Diagrams ...