CHAPTER 2. SETUP
7
Note:
If errors persist, please contact B&K for further assistance.
2.2 Extension Modules
Up to 10 extension modules may be connected at a time.
Figure 2.4: Extension Module
To assemble multiple terminal block modules:
• Screw the electrical connectors’ plate to each additional extension
• Assemble the extension modules together
• Screw the plates with the adjacent modules
• Stick the additional adhesive buttress
• Connect the cable using unlocking levers
• Connect the cable on the DAS240 (must be powered off first)
• Switch on the unit.
Note:
The unit is delivered with a 70cm cable.
2.3 Making Measurement Connections
Using the terminal blocks provided with the unit. Figure
(Phoenix Contacts: SMSTB 2,5/3-ST5,08 - 1826296)
2.3.1 Voltage Measurement
Voltage measurement is performed between the + and - terminals of the relevant input. The “GND” terminal is
not used.