
WatchDog / WatchCat
Create a complete power cycle in the event of a lost signal
Goto> Services>Watchcat
>ADD
Operating Mode – set to
-
Reboot in the event of an Internet loss
-
Reboot on a schedule basis
Forced Boot delay
– set to 0 (the internal Watchdog in the firmware already has a timer) for power cycle
-
set to >0 for a soft re-boot
Period: Is the period of time allowed before the router begins the re-boot/power cycle process
Ping host: 8.8.8.8 (Google) or any reliable stable source where the router can check connectivity
Ping Period: Is the time for every Ping.
In the screen example, the router will ping every 5 seconds. If it pings 5+5+5+5+5_5 (=30)
without response from site 8.8.8.8 then it will begin the power cycle sequence.
Summary of Contents for RM-826-Q25-WD
Page 1: ...BizLink Router RM 826 Q25 WD 3G 4G LTE High Performance Network Router User Manual...
Page 10: ......
Page 18: ......
Page 45: ......