18
Periodic Inspection
The following is required to be inspected periodically:
ANSI/ASME B30.16 requires all hoists subject to disassembly of load suspension parts,
to undergo a load test after re-assembly to pass full inspection.
Requirements of frequent inspection:
•
Evidence of loose bolts, nuts, or rivets.
•
Evidence of wear, corrosion, cracks, or distortion to parts such as load blocks,
suspension housing, chain attachments, clevises, coupling, suspension bolts,
shafts, gears, bearings, pins and rollers.
•
Evidence of damage to bottom block assembly.
•
Evidence of excessive wear on motor or load brake.
•
Evidence of damage of supporting structure/ trolley.
•
Direction labels on pendant control stations.
•
Warning labels properly attached to the hoist.
•
Load chain end connections.
•
Evidence of wear, cracks or stretching on the load chain.
Summary of Contents for HHBD01SK-01
Page 11: ...11 HOIST MOTORIZED TROLLEY ASSEMBLY INSTALLATION...
Page 23: ...23 HOIST HOUSING ASSEMBLY Diagram A...
Page 25: ...25 HOIST GEAR ASSEMBLY Diagram B...
Page 29: ...29 HOIST CHAIN ENTRY LIMIT SWITCH ASSEMBLY Diagram D...
Page 31: ...31 MOTORIZED TROLLEY ASSEMBLY Diagram E...
Page 34: ...34 SINGLE SPEED HOIST Wiring Diagram 1 2 3 5 Ton Models...
Page 35: ...35 DUAL SPEED HOIST Wiring Diagram 1 Ton Model...
Page 36: ...36 DUAL SPEED HOIST Wiring Diagram 2 3 5 Ton Model...
Page 37: ...37 SINGLE SPEED HOIST TROLLEY Wiring Diagram 1 2 3 5 Ton Models...
Page 38: ...38 DUAL SPEED HOIST TROLLEY Wiring Diagram 1 2 3 5 Ton Models...