34
english
Depending on the temperature and the system pressure,
the hot pumped fluid may be emitted as a liquid or a gas.
– Never remove the screw plug completely
The pump may suck air in.
A great volume of fluid may be lost.
– Switch the pump on and off some 5 to 8 times
until only water comes out of the screw plug.
– Tighten the screw plug.
– Increase the system pressure
– Switch the pump on.
6.3 Operational monitoring
An LED must always be lit in Area A2.
See Section 7.2
6. Initiation/operating control
6.1 Generalities
Thoroughly rinse the equipment without the pump. See Section 4.
Fill and ventilate the system appropriately.
Only put the pump into operation where the unit is filled.
Switch on the supply voltage.
6.2 De-aeration
It is recommended that the pump be ventilated prior to commissioning.
Proceed here as follows:
– Switch off the pump
– Lower the system pressure to 0.2 bar
– Loosen the screw plug (roughly one turn counter-clockwise)
until water comes out.
There is a danger of scalding
961327_00
Summary of Contents for A 402 V2
Page 79: ...DIN 4844 W8 DIN 4844 W9 1 1 1 1 2 1 3 1 4 79...
Page 80: ...1 5 1 6 NIN CENELEC 1 7 1 8 1 9 80 2...
Page 82: ...82 4 4 1 4 2 50 10 4 3 4 4 90 4 961316_00 961315_00 961317_00...
Page 86: ...86 Biral 9 10 1 230 PE L N 1 230 6 10 50 PE F1 DIN VDE 0664 F1 F1 3 5 F1 5 1 FI...
Page 88: ...88 5 8 6 3 A2 7 2 6 6 1 4 6 2 0 2 961327_00...
Page 90: ...90 7 7 1 A1 A1 7 1 A2 7 2 A3 7 6 961204_00 cp A2 7 3 V V 25 50 75 100 7 2 A1 3 3 3 4 3 4...
Page 92: ...92 8 1 80 C 8 961328_00...
Page 93: ...93 9 10 4 8 4 6 2 11 7 2 7 2 6 2 t t t t...
Page 95: ...11 1 230 6 10 50 IP 44 H 40 C 10 16 55 A 3 5 2 10 C 95 C 40 C 12 95...