Epic Hygiene
User Manual
7.1 SYSTEM SETUP
7.2 CONNECTING
THE FIBER
OPTIC CABLE
The
Epic Hygiene
ships with the Fiber Optic Cable already connected to the laser console.
To disconnect the Fiber Optic Cable from the laser console,
make sure the laser console is
turned off and the cable is completely unwound from the console base
, grab the Fiber
Optic Cable access plug and slowly pull it straight back from the optical access port (Figure 7.1).
To re-install the Fiber Optic Cable,
make sure the laser console is turned off
. The Fiber Optic
Cable is attached to the console by inserting the optical access plug (Figure 7.1) into the optical access
port (Figure 7.2).
CAUTION:
Do not connect or disconnect the fiber cable while the laser console is turned
ON. Only connect or disconnect the fiber when the laser console is turned OFF.
19
7
Installation and Set-Up
• Place the unit in a clean, dry, and well-ventilated area;
do not
cover or block the ventilation
channels. These channels provide an air-flow path to cool the unit.
• Verify the power switch is in the OFF (O) position.
•
Epic Hygiene
will work using either DC power or its rechargeable battery pack:
o
DC Power
Supply Module
: Connect the
DC
power supply
module
to the laser console
, attach
one end of the power cord to the
DC
power supply module
and plug
the other end of the
power
cord
into
a wall outlet
.
o
Rechargeable Battery: The
Epic Hygiene
is shipped with the battery pack already installed; to
charge the battery pack, connect the power cord of the DC power supply
module
to the laser
console
and plug into a wall outlet. Before first use, fully charge the battery (at least 3
hours).
Once
the battery is charged, unplug the power cord from the wall outlet and the
laser
console. The
laser console will run on battery power alone. To fully charge the
battery, plug
the
DC
power
supply
module
in and then turn the laser console ON ( I ) at the power
switch.
The laser console will
start to charge and the unit will go into Sleep mode (the
screen is dark)
after 5 minutes; if the
power supply is plugged in but the console is
turned OFF (O) at the
power switch, the battery
will still charge, but at a slower rate
.
NOTE:
The laser ships with the lithium ion battery pack already installed.
FACILITY REQUIREMENTS:
Electrical Supply:
100V - 240V ~ at 1.5A, 50/60Hz
Environmental:
Temperature 15-35 ºC (59-95 ºF), Humidity 10-90%, non-condensing
Summary of Contents for Epic
Page 2: ...PAGE LEFT BLANK ...
Page 51: ...Appendix F Electromagnetic Compatibility 51 Epic Hygiene User Manual ...
Page 52: ...Appendix F Electromagnetic Compatibility Epic Hygiene User Manual 52 ...
Page 53: ...Appendix F Electromagnetic Compatibility Epic Hygiene User Manual 53 ...
Page 55: ...PAGE LEFT BLANK ...