![BIO UV MP030 EL Installation And Maintenance Manual Download Page 21](http://html1.mh-extra.com/html/bio-uv/mp030-el/mp030-el_installation-and-maintenance-manual_2753216021.webp)
MP 030 EL NM GB
Copyright BIO-UV - 29/01/2009
Marque, Modèles et Brevets déposés - Produits exclusifs
Page 21
11
Centre the quartz sleeve, it should stick out equally on both sides.
12
Change the quartz seals:
(Put new seals at each change of lamp)
●
lubricate the seals using food grade grease,
●
position them around the sleeve,
●
push them fully home in their housing using your nail (help you with
aluminium washer.
13
Replace the aluminium washer with them PTFE ring and replace the MP nuts.
14
If your reactor is not fitted with PTFE rings, contact your retailer, who will supply the kit PDP003478
and the fitting instructions.
15
Put the installation back in pressure before the reassembly of lamps and
check that there is no leakage in the quartz sleeve.
16
Take hold of the new lamp taking care not to place your fingers outside the cap.
(if you do, clean the lamp with a soft cloth and some methylated spirits).
17
Fully engage the lamp in the quartz sleeve.
18
Reposition the Teflon lamp supports (if your model is fitted with supports).
19
Replace the aluminium lamp base on both sides.
20
Rewire the UV lamp
21
Replace the two covers..
22
Check the calibration of the UV-C ray measurement cell.
(See chapter MANUAL OF THE MONITOR).