6
3. Installation
3.1 Equipment Layout
The connection to the mains and the arrangement for operation must be carried out by a
qualified professional. Check that the voltage of the eqiuipment matches the mains voltage.
• In the installation, it is essential to make this manual available to the professionals who will
do the same.
To ensure correct operation and safety, the machine must be positioned in an airy
environment and on a sufficiently wide, level, dry and stable support surface, away from heat sources
and water taps, and at a medium height of 80 cm. Install your equipment by leaving a free area on the
front, a distance of at least 60 cm above the equipment and a distance of at least 30 cm around it, so
that it has enough space for inspection, maintenance, cleaning and use.
Summary of Contents for METVISA PCI.10 Series
Page 1: ...1 ...
Page 20: ...20 Electrical Schematic Voltage 220 V 50 Hz 3 4 hp and 1 hp Models PCI PCL 10 22 MF ...
Page 26: ...26 Blown up Design ...
Page 27: ...27 Blown up Design ...