![Bilstein B8 8100 Mounting Instruction Download Page 17](http://html1.mh-extra.com/html/bilstein/b8-8100/b8-8100_mounting-instruction_2751805017.webp)
E4-WM5-Y630A00
MOUNTING INSTRUCTION
created: 04.16.19 E4-WM5-Y630A00_2 Page 17 of 22 latest revision: 09.29.20
GX460 Right Side Reservoir Installation Procedure:
FF.
Prepare the assembly below by applying non-permanent thread locker to two Flat Head Screws (BOM item #13).
Mount the Reservoir Clamp (BOM item #12) to the Reservoir Mount Plate (BOM item #11) as shown below using the
two Flat Head Screws. Tighten using a 5mm hex.
Torque both Flat Head Screws to 16 ft-lb (22 Nm).
GG.
Place the Nylock (BOM item #3) in the upper slot of the Reservoir Clamp as shown below. Then place the Socket
Head Cap Screw (BOM item #14) through the hole in the Reservoir Clamp, threading it into the Nylock. Thread in a
few turns for now with a 5mm hex but leave loose enough so the reservoir can be installed in the next step. Apply
non-permanent thread locker to one Flange Head Cap Screw (BOM item #15) and place it through the hole in the
Reservoir Mount Plate as shown below.
Front side
Back side
HH.
Slide the reservoir through the Reservoir Clamp as shown below. Snug up the Socket Head Cap Screw (BOM item
#14) so that the reservoir bracket assembly doesn’t fall off the reservoir. But leave loose enough to be able to slide
the reservoir back and forth in the Reservoir Clamp.
Front side
Back side
Install Nylock
on this end