![Bilstein B8 8100 Mounting Instruction Download Page 15](http://html1.mh-extra.com/html/bilstein/b8-8100/b8-8100_mounting-instruction_2751805015.webp)
E4-WM5-Y630A00
MOUNTING INSTRUCTION
created: 04.16.19 E4-WM5-Y630A00_2 Page 15 of 22 latest revision: 09.29.20
Z.
Complete steps V-Y for the three places shown below:
Under rear quarter panel
In wheel well
4Runner & GX470 Right Side Reservoir Installation Procedure:
AA.
Prepare the following assembly by applying non-permanent thread locker on two Flat Head Screws (BOM item #13).
Mount the Reservoir Clamp (BOM item #12) to the Reservoir Mount Plate (BOM item #11) as shown below using the
two Flat Head Screws (BOM item #13). Tighten using a 5mm hex.
Torque both Flat Head Screws to 16 ft-lb (22 Nm).
BB.
Place the Nylock (BOM item #3) in the upper slot of the Reservoir Clamp as shown below. Then place the Socket
Head Cap Screw (BOM item #14) through the hole in the Reservoir Clamp, threading it into the Nylock. Thread in a
few turns for now with a 5mm hex but leave loose enough so the reservoir can be installed in the next step. Note that
the counterbores are facing the frame for this side. This is so the plate will still mount flush to the frame if the
Threaded Inserts are required.
Front side
Back side
Install Nylock
on this end
Counterbores
Note: This hole may not be
present on some GX470
models. If it’s not, it will need to
be drilled out with a 25/64” or
10mm drill bit in order to install
the threaded inserts. Drill the
hole approximately where
shown.