Operating manual No.
057-2-6-0012-R0
Page 22
Version 2021
EN
7
Operation section
Figure 3 – general model of a lifting platform
7.1
Loading operations
Before installing the vehicle above the kickstand it is essential to check that the lifting platform is
completely lowered
.
1-
Load the motorcycle on the work surface, supporting it centrally on the kickstand.
2-
Secure the vehicle with the belts and then tie the latter to the appropriate loops on the work
surface
WARNING
: Never lift the load before making sure it is firmly fastened to the platform
with belts.
Always check during lifting that the load does not slope and unbalance;
3-
Proceed with the lifting operation of the structure by pressing the pedal (or with the electro-
hydraulic control) up to the desired height.
7.2
Unloading operations
1-
Lift the mechanical safety bar which prevents the lifting platform from falling back;
2-
In case of using the HQL 400_003 lifting platform (electro-hydraulic system), press the
descent button.
In case of using the HQL 400_001 lifting platform (foot pump system), press the descent
pedal
3-
Pull the motorcycle down from the kickstand.
Summary of Contents for HQL 400
Page 17: ...Operating manual No 057 2 6 0012 R0 Page 17 Version 2021 EN ...
Page 33: ...Operating manual No 057 2 6 0012 R0 Page 33 Version 2021 EN SPARE PARTS TECHNICAL DRAWINGS ...
Page 34: ...Operating manual No 057 2 6 0012 R0 Page 34 Version 2021 EN ...
Page 35: ...Operating manual No 057 2 6 0012 R0 Page 35 Version 2021 EN ...