1
2
3
8
Screw (3x6mm)
3mm
Assemble the inner gear doors to the fuselage with screws and epoxy,
connect the horn on the inner gear door to the servo with push rod.
4
Pin hinge(36x20x1mm)
2
Horn
12
TP Screw (2x10mm)
Epoxy the pinned hinges,horns to the inner gear door carefully,
drill holes through the gear door and pinned hinges and fix the
pinned hinges tightly to the inner gear door.
1.0mm
1.0mm
TP Screw (2x10mm)
B'
A
A'
B
Make sure to glue securely.
If not properly glued, a failure in flight may occur.
Temporarily fasten down the main wing and
check its correct position.
Securely glue together.If coming off during flights,
you'll lose control of your airplane which leads
to accidents!
A = A '
B = B '
The sketch map should be when the wing assembly
completion.
The sketch map when the gear get down.
Drill holes to the landing gear doors and assemble them
to the landing gears with screws.
Factory already set blind nuts in the wings, the customers can
fix the wing to the fuselage by tightening the nylon screws.
2
Screw (6x50mm)
Screw (6x50mm)
Screw (3x6mm)
TP Screw (2x10mm)
2
Clevis
2
2
Screw (2x12mm)
Nut (2mm )
2
Rod (2mm)
2
Retainer
8
TP Screw (2x10mm)
12
13
11
16
15
3
14
30mm
30mm
40mm
AILERON
FLAP
Side View
Adjustment.
AILERON
FLAP
Top view
Position for
right diagram.
ELEVATOR
Side View
30mm
30mm
Adjustment.
Assemble the clear canopy to the cockpit with AC glue
and fix the antenna to the cockpit with screw.
Top view
Side View
40mm
40mm
RUDDER
Adjustment.
Assemble the entire cockpit to the fuselage.
145mm
The centre of the Gravity.
Screw (3x15mm)
Washer(3x6mm)
1
Screw (3x15mm)
1
Washer(3x6mm)
51
52
54
55
10
50
53