![Biasi 41-583-30 User Manual And Installation Instructions Download Page 69](http://html1.mh-extra.com/html/biasi/41-583-30/41-583-30_user-manual-and-installation-instructions_2748888069.webp)
- 69 -
MAINTENANCE
MAINTENANCE
10 MAINTENANCE
10.1 Warnings
The procedures detailed in this chapter
must
be carried out only by a Gas Safe Regis-
tered Engineer
. Thus you are advised to con-
tact an Authorised Service Agent.
For Ireland (IE), the servicing work must be
carried out by a competent RGII registered.
For efficient and continuous operation of the
boiler you are advised to have, at least once
a year, maintenance and cleaning done by an
Approved Service Engineer.
Isolate the appliance from the electricity
supply
by turning off the fused spur isolation
switch adjacent to the appliance
.
Turn off the gas cock
, before carrying out
any procedures, whatsoever, for cleaning,
maintenance, opening or dismantling boiler
panels
.
Other devices i.e. external con
-
trols may lead dangerous voltage
inside the appliance as well.
Ensure they are isolated.
In case of doubt turn off the gen-
eral system switch.
The Engineer
should complete the Service
Interval Record at the back of the manual.
10.2 Programming the maintenance
period
•
Activate the clock function, as described in
"Time/Day/Date setting" on page 14.
•
Enter in "programming mode" by sequen
-
tially
pressing keys 13 - 16 - 17 together for
10 seconds (Fig. 10.1) until the LCD display
indicates the letters
P01
, indicating entry in
“parameter 01” (Fig. 10.2).
Fig. 10.1
10
11
12
13 14
15
16
17
18
Fig. 10.2
•
Scroll through the various parameters using
key 16 or 17 until the LCD display indicates
the letters
P28
and the value of the param
-
eter, indicating entry in “parameter 28” (Fig.
10.3).
Fig. 10.3
•
Use key 10 or 11 to modify the value of pa
-
rameter 28 from
00
months to
48
months.
The value
99
, which disables the mainte
-
nance request, is permitted.
The writing
P28
-
SEt
alternates on the dis-
play (Fig. 10.4).