45
Fig.6.3
Fig.6.2
Fig.6.1
6.0 MAINTENANCE AND INACTIVITY
6.1 Cleaning and Loading
So as to guarantee the correct functioning of the distributor during time it is necessary to effect some operations periodically,
some of which are indispensable for the observance of the health standard norms. These operations must be done with the
distributor open and switched off. The cleaning operations must be effected before the loading of the products. In order to
guarantee normal operation, the machine must be installed in areas that the environmental temperature is between a minimum
of -1°C and a maximum of +32°C end humidity of not over 70%. Must not be installed in places where cleaning is done with
water hoses(ex. big kitchens.).
Do not use water jets to clean the machine.
Please refer to the provisions of section 5.0 SAFETY REGULATIONS and section 4.0 INSTALLATION of this manual.
6.1.1 Recommended maintenance
Bianchi Vending spa
guarantees the proper operation of its distributor over time only with a preventive maintenance
carried out in compliance with the provisions listed below:
6.1.3 Daily cleaning recommended
The objective is that to avoid the creation of bacteria in the food
zone areas.
For all cleaning operations follow the instructions indicated
in paragraph 6.3.1.
Operate as follows:
- clean all the visible parts in the dispensing area. (Fig. 6.1 e Fig.
6.2)
remove and clean carefully:
– funnels and powder chutes (Fig. 6.3-pos.1)
– water funnel (2), mixing bowls (3) whipper assembly (4)
6.1.2 Periodic cleaning by the maintenance tech-
nician
First step:
disposal of the waste inside the waste bins (used cups,
stirrers, paper, tissues etc).Once the waste has been disposed of
it is possible to clean the surrounding area.
- elimination of the coarse dirt
- disinfecting of the fl ooring and walls of the area surrounding
the machine up to a radius of 1 metre around the distributor
- once this is complete proceed with opening the distributor.
TYPE OF INTERVENTION
No. of COUN
5.000
10.000
20.000
30/40.000
70/80.000
Softener regeneration (*Resins)
Replacement of piston equipped with fi lters and gask
Replacement of entire coffee group
Decalcifi cation of espresso boiler and solenoid valves
Replacement of grinders
Decalcifi cation of instant drink boiler and solenoid valve
*: if not otherwise recommended by the softener supplier.