Transport, Installation and Connection
4-1
4
Transport, Installation and Connec-
tion
All installation and connection work may be carried out by
qualified and approved specialist staff only !
The legal regulations as well as adjustment instructions of
the plant operator have to be observed!
4.1
Scope of delivery
•
Compact Flame Controller CFC 2000
•
Operating instructions CFC 2000
•
Handbook CFC Com1
•
Connecting cable (with ex-proof housing)
•
Harting cable terminal box kit (not with ex-proof hous-
ing)
4.2
Accessories (optional)
•
Power supply unit 230/115 V AC
•
Power supply 5002
•
1" swivel mount with 2" flange disk
•
1” 3-way-ball-valve
•
1” heating insulator
•
1" pressure barrier 5 bar
•
Optical alignment device
•
Fiber optic cable
•
Software CFC Com1 and data cable
Refer to the order papers for the exact scope of delivery
and compare with the delivery note.
Checking for completeness
Check the entire delivery for completeness against the
accompanying delivery note. Please refer to our terms of
sale and delivery otherwise.
Summary of Contents for CFC 2000
Page 2: ......
Page 20: ...Safety 2 8...
Page 26: ...Technical data 3 6...
Page 40: ...Transport Installation and Connection 4 14...
Page 46: ...Operation of the Compact Flame Controller 6 2...
Page 48: ...Care and Maintenance 7 2...
Page 52: ...9 2...
Page 54: ...10 2...
Page 55: ...Accessories 10 3...