background image

 

                                                           

 

2

Changing the language (switch between Chinese and English) 

3

Turn on or off the buzzing 

4

When you choose the power saving mode, the screen brightness will be off if the screen is 

not touched for a long time. 

 

 
 
 
 
 

 
3.5.1 Every setting will be valid only after saving. You will return to the previous menu if without 
saving, all settings will be invalid. 

 

4.Maintenance 

4.1

Turn off the power before maintenance 

4.2

Clean the testing platform after the testing 

4.3

Checking the tightness degree of belt per month and do some adjustment properly. 

4.4

Take apart the main machine once a year. Incline the bottom, remove the chassis, and loose the 

screws in each corner. Wash the rod and oil with the  Lithium Grease. Put the bottom back to the 

original position and place it on the horizontal plan.   

Changing Brightness 
 

Turn on/off the buzzing 
 

When you choose the power 
saving  mode,  the  screen 
brightness  will  be  off  if  the 
screen  is  not  touched  for  a 
long time

 

Display the date of  manufacture, 

version  number,  device  number 

of the instrument 

Changing Language 
 

Summary of Contents for 1818 Series

Page 1: ...AUTOMATIC FILM APPLICATOR BEVS 1818 User Manual Version V201805 This manual shall be read carefully before starting Directions included in this operation manual shall be strictly followed...

Page 2: ...oduction 1 2 1 Technical Specifications 2 3 Product Operation Introduction 3 3 1 Name and description of each part 3 3 2 Operation Steps 3 3 3 Touch Screen Operation 4 3 4 Parameter Setting 6 3 5 Syst...

Page 3: ...film applicator is used to make uniform and traceable film with good reproducibility Manual operation is often uncoordinated especially between different operators which makes it difficult or even un...

Page 4: ...aximum Film Length 250mm 2 13 Speed 1mm s 200mm s Adjustable 2 14 Speed Precision 1mm s 2 15 Dimensions length width height 450 mm 300 mm 210 mm 2 16 Test platform glass test platform or vacuum test p...

Page 5: ...on the vacuum test platform or glass test platform and then fix it 6 When using glass test platform to make film clamp kits can be used to clamp the base material The base material is placed on the gl...

Page 6: ...is the upper station 7 Refer to the 3 3 Touch Screen Operation 8 Press the Run button to start testing 3 3 Touch Screen Operation 3 3 1 Connect the power 24V 3 3 2 Turn on the power switch and check...

Page 7: ...djust the position after vacuum adsorption 2 The base material must completely cover the pores on the vacuum table otherwise the adsorption strength will be greatly reduced or even unable to adsorb 3...

Page 8: ...r The unit is mm s 1 2 The return speed can change the return speed of the push rod after returning to the position when the coating is finished the unit is mm s 1 3 Coating size you can set the film...

Page 9: ...ting platform after the testing 4 3 Checking the tightness degree of belt per month and do some adjustment properly 4 4 Take apart the main machine once a year Incline the bottom remove the chassis an...

Page 10: ...the machine in the solid working platform 5 3 Reliable ground lead is necessary in power outlet 5 4 Working Environment Using the machine in the inside room and the temperature is between 15 35 5 5 P...

Reviews: