SECTION B | INSTALLATION
PART B
–
BOX INSTALLATION
STEP 1
–
INSTALL BOX TO WALL/CEILING
FACE FIX
SIDE FIX
TOP FIX
NOTE:
Use appropriate fixings to suit application. Ensure Box is Aligned and Level. Ensure 2
fasteners are used per side.
PART D
–
OPEN BRACKET INSTALLATION
STEP 1
–
INSTALL BRACKETS TO WALL/CEILING
FACE FIX
SIDE FIX
TOP FIX
NOTE:
Use appropriate fixings to suit application. Ensure 2 fasteners are used per side. Ensure
brackets are aligned and level.
Measure brackets end to end to confirm measurement is correct.
Page. 6