background image

SECTION A | TOOLS AND ADDITIONAL ITEMS REQUIRED

 

 

 

 

PART D 

 BLIND ITEMS REQUIRED

 

WIRE GUIDE AND FIXING HARDWARE

 

OPTION 1 

 Hook Terminal

 

 
 
 

 

 

 

                                                                         

 

 

 

 

                                                                       STRAP DOWN HARDWARE 

 

 

               

                                              

 

                                          

 

                                                              
                                        SS SADDLE

 

&

 

SWIVEL EYE SHACKLE                  DIAMOND EYE PAD

 

 
 
 
 
 
 
 
 
 
 
 
 

 

 

 
 
 
 
 
 
 
 
 

 
 

                                                                                                                    

 

Page. 4 

Summary of Contents for VEUE

Page 1: ...N MANUAL m Up VEUE WIRE GUIDE INSTALLATION MANUAL ...

Page 2: ... REQUIRED 3 PART B ADDITIONAL ITEMS REQUIRED NOT SUPPLIED 3 PARTC BLIND ITEMS REQUIRED 3 PART D BLIND ITEMS REQUIRED 4 PART A PREPARING INSTALLATION SPACE 5 PART B BOX INSTALLATION 6 PART C OPEN BRACKET INSTALLATION 6 PART D BLIND INSTALLATION 7 PART E TENSION GUIDELINES 13 SECTION B INSTALLATION 5 ...

Page 3: ...Pencil PART B ADDITIONAL ITEMS REQUIRED NOT SUPPLIED To assemble an Veue Wire Guide the following non stocked items are required Fixings for Box Open Brackets Hardware ensure appropriate fixings are used to suit application Trims to conceal packing if required PART C BLIND ITEMS REQUIRED BOX OPEN BRACKETS or NOTE Store clip until required can be left in adaptor as shown BLIND ...

Page 4: ...SECTION A TOOLS AND ADDITIONAL ITEMS REQUIRED PART D BLIND ITEMS REQUIRED WIRE GUIDE AND FIXING HARDWARE OPTION 1 Hook Terminal STRAP DOWN HARDWARE SS SADDLE SWIVEL EYE SHACKLE DIAMOND EYE PAD Page 4 ...

Page 5: ... HORIZONTAL INSTALLATION DIMENSIONS VERTICAL DIMENSIONS HORIZONTAL DIMENSIONS Check if top of installation space is level If H1 H2 corrective actions may need to be considered prior to installation If W2 W1 W1 Blind Width proceed to Part B If W2 W1 by a value of 0 20mm Proceed to Part B W1 Blind Width 20 Consider corrective action to square installation space Page 5 ...

Page 6: ...nsure Box is Aligned and Level Ensure 2 fasteners are used per side PART D OPEN BRACKET INSTALLATION STEP 1 INSTALL BRACKETS TO WALL CEILING FACE FIX SIDE FIX TOP FIX NOTE Use appropriate fixings to suit application Ensure 2 fasteners are used per side Ensure brackets are aligned and level Measure brackets end to end to confirm measurement is correct Page 6 ...

Page 7: ...TO SUIT Wire Centres BOX 19mm OPEN 18mm NOTE Cut wire to assist installation ensure wire is not cut too short excess can be trimmed later FLOOR FIX FACE SIDE FIX FLOOR FIX OPTIONAL FOR SECURING TO MASONRY NOTE Ensure fasteners suit substrate application Max fastener size 10 Max Dynabolt Size M6 Page 7 ...

Page 8: ...ON B INSTALLATION PART D BLIND INSTALLATION STEP 2 INSERT SPRING ONTO WIRE STEP 3 ATTACH WIRE AND SPRING TO BRACKET OPTION 1 HOOK TERMINAL NOTE Tube hardware not shown for clarity of wire installation Page 8 ...

Page 9: ...BOX STEP 5 INSERT WIRE THROUGH WEIGHT BAR END CAP FLOATS NOTE Insert control end first Ensure blind is secure PART D BLIND INSTALLATION STEP 6 INSERT CLIP INTO IDLER ADAPTER IDLER END Page 12 Page 9 Ensure pin is clipped in securely Tighten the Screw ...

Page 10: ...SECTION B INSTALLATION PART D BLIND INSTALLATION STEP 7 FEED THROUGH MOTOR CABLE FOR MOTOR ONLY STEP 8 RUN BLIND DOWN CENTRE Page 10 ...

Page 11: ...LIND INSTALLATION STEP 9 TEST BLIND OPERATION For motor operation ensure wiring is correct and motor is operating correctly For gear operation ensure operation is smooth Once blind is operating correctly proceed to next steps Page 11 ...

Page 12: ...F ORDERED STEP 1 UNLOCK SADDLES AND SLIDE TO REQUIRED POSITION SUGGESTED 100MM NOMINAL FROM END CAP LOCK BOTH SADDLES TO THE BOTTOM RAIL STEP 2 ATTACH THE DIAMOND EYE PAD DIRECTLY BELOW SWIVEL EYE SHACKEL WITH APPROPRIATE SCREWS SS SADDLE SWIVEL EYE SHACKLE DIAMOND EYE PAD Page 12 ...

Page 13: ...SECTION B INSTALLATION PART E TENSION GUIDELINES STEP 1 SLIDE ADJUSTING SLEEVE THEN WIRE TERMINAL ONTO WIRE AND TIGHTEN UP OUT OF THE WAY NOTE Use 2mm Allen Key Page 13 ...

Page 14: ...LANGE WITH M4 GRUB SCREW CLAMP TO WIRE FLOORFIX FACE SIDE FIX STEP 3 TIGHTEN REMAINING GRUB SCREWS ON WIRE TIGHTEN 3X GRUB SCREWS PER WIRE FLOORFIX FACE SIDE FIX NOTE Use 2mm Allen Key NOTE Use 2mm Allen Key STEP 4 LOWER ADJUSTING SLEEVE INTO COLLAR TO TENSION WIRE FLOORFIX Page 14 FACE SIDE FIX ...

Page 15: ...LEEVE UNTIL WIRE BEGINS TO TENSION FLOORFIX FACE SIDE FIX STEP 6 TO APPLY MIN REQUIRED TENSION TIGHTEN WITH 5X TURNS USING ALLEN KEY FLOORFIX FACE SIDE FIX STEP 7 ONCE TENSIONED SCREW IN GRUB SCREW TO PREVENT LOSING TENSION FLOORFIX FACE SIDE FIX NOTE Use 2mm Allen Key Page 15 ...

Page 16: ...ION PART E TENSION GUIDELINES STEP 1 SWING BOX COVER INTO BOX TOP AND CLIP INTO PLACE STEP 2 SECURE COVER AT BOTH ENDS Note It is recommended that the Box Cover be fixed to ensure it is not accidentally dislodged Page 16 ...

Page 17: ...SECTION B INSTALLATION PART E TENSION GUIDELINES BOX OPEN Page 17 ...

Page 18: ...the terminal then reposition Refer to Part C Step 1 of this document for wire guide positioning details Incorrect motor stop limits used Refer to motor instructions to reset stop limits 3 Ripples along sides of fabric Blind roll is not level thus weight bar ap pears uneven Ensure blind is installed level Blind has been operated in excessive wind conditions Check blind roll when the blind is fully ...

Reviews: