5
5. Pre-Installation Requirements
• Read this technical manual before beginning installation of equipment.
• Know what products are required for use in maintaining the facility. There are several different
products to choose from for virtually any cleaning application.
• Make sure all components outlined in Section 3a are in the carton.
• Use water supply lines from tap water outlets with a minimum of 20 PSI, not to exceed 80 PSI, and
water temperature must not exceed 100°F.
• When using the
FASTDRAW
®
Rack (Item #91044-00), be sure the surface can sustain a 20 lb. load.
• Make sure to allow 10 inches on the right side of the dispenser for attaching the water supply hose
and to allow ample room for bottle insertion.
• Install the unit close to a floor drain or sink whenever possible.
• As with all chemicals, place the system in an area that can be secured from unauthorized
personnel.
6. Tools Required For
FASTDRAW
®
Installation
• Hammer
• Pliers
• Tape Measure
• Drill with 1/4”, 1/8” and 9/32” Diameter Bits
• Medium Phillips Screwdriver
• Straight Edge Level
• Pencil or Marker
Summary of Contents for Fastdraw
Page 15: ...15 ...