Bekamatic
®
Industry
ed. April 2006 ENGLISH
8/21
4.2 Installation of the ground anchors
1. Put a tension line in the centre of the position
where the gate must be installed. From the
point of the lock post to the point where the rear
support roll has to come.
2. Position the templates of the guiding - and
lock post as well as the template of the rear
supporting wheels with the marked centre under
the tension line. Take in account the inter-
distances as mentioned on the foundations plans
provided with the order document.
3. Mark the position of the holes with a small
diameter concrete drill, this will help to centre
the final drill.
4. Drill the corresponding holes for the fixation
according the installation instructions of the
supplier of the chemical anchors. Drillings must
be in good vertical position.
5. Remove any dust and small particles from the
drill holes using a brush and hand pump. This will
ensure perfect adhesion between the resin for
the ground anchor and the concrete foundation.
6. Place the chemical anchors according to the
instructions of the supplier.
Drying times must be
respected.
60761BM IM Ind_ENG.indd 8
60761BM IM Ind_ENG.indd 8
08-05-2006 09:11:14
08-05-2006 09:11:14