1. Parts of the fence
3
2. Advice prior to the installation of
Bekazur
Ground preparation: to ensure your Bekazur fence is stable,
it must be installed on a stable base (tiles on concrete screed
- min. 250kg/CPA). If your pool does not have a tiled surroun-
ding, you need to create concrete blocks and screw in the
bases, or use the posts to be embedded.
It is recommended that Bekazur be installed at least one metre
from the water. For private pools for individual or family use, it is
also recommended that you do not install Bekazur too far from
the pool, so it does not lose its effectiveness.
There should not be a fixed (e.g. low wall) or mobile
support point and:
- on the outside of the barrier in relation to the pool - for
all types of barrier (railings or solid panels) - ensure there
is nothing within a radius of 1.10 m;
- on the inside of the barrier in relation to the pool - for
railing fences only - ensure there is nothing with a distance
of less than 0.4 m from the barrier.
Tools necessary for assembly:
spirit level, guiding line,
rotary hammer,
measuring tape, wedge,
screwdriver, etc.
panel width 2m
panel width 1m
collet
footplate
post
gate
Perimeter around
the barrier
Legend:
1. Barrier
2. Unacceptable 3. Acceptable