Fitting the oil line
- Position oil line
3
and fasten it with the two oilway screws
1
and
2
, using new seal rings. Tightening torque: 10 N·m.
Position the oil line so that it does not come into contact
with the engine. Also, when tightening, ensure that the oil
line is not taut.
Installing the starter motor
– Carefully oil the O-ring on the starter motor and insert the mo-
tor in the crankcase. Fit the two screws
4
(M6x20) and tighten
them to 8 N·m.
– Oil distance ring
5
and slide it onto the driven shaft with the
groove for the O-ring facing inward.
– Fit the chain sprocket with the high collar facing inward.
– Degrease the flange nut thread, apply Loctite 243 to it and
tighten the screw with the spring washer to 60 N·m.
NOTE:
Before tightening the screw, lock the crankshaft and shift
into first gear.
69
6 - Engine
Release 00 Date 02/2005
1
2
3
4
5
Summary of Contents for RR 4T-250
Page 1: ...WORKSHOP MANUAL RR 4T 250 400 450 525 ...
Page 98: ...3 7 Carburettor Release 00 Date 02 2005 CARBURETTOR KEIHIN FCR M X 39 ...
Page 109: ...3 8 Front suspension wheel Release 00 Date 02 2005 Four Stroke l ...
Page 165: ......
Page 199: ......
Page 212: ...6 TROUBLESHOOTING 149 GB CONTENTS CHARTER 6 TROUBLESHOOTING INDEX ...
Page 215: ...152 ...