E1
MAINTENANCE
Cleaning
Taking the time to clean the sprayer after each use is the most important thing you can do to
improve the performance and longevity of your BESTWAY Field-Pro II sprayer. This is particularly
important after the use of suspension type chemicals, which can crystalize and plug the flowmeter,
lines and/or spray tips. The potential benefits include less down time, an improved spray pattern
and an extended sprayer life.
1. Always end the day with an empty tank. If that is not possible, close the main shutoff valve
under the tank.
2. Rinse the interior of the tank and flush all the plumbing with clean water at the end of each
day and between each chemical change using the built-in Rinse System. If a film is detected on the
interior of the tank, add 2 to 3 pounds of detergent to 50 gallons of water. Refer to the “Rinse
System” section of this manual for more information on this step.
3. If possible, apply all rinse water from the tank on a field that has been previously sprayed.
Most pesticides are very safe unless they are used in a highly concentrated form. Take special
precautions, however, to avoid high concentrations in one spot.
4. Wash off the exterior of the sprayer, including the valve block and all manual valves. Make
sure chemical and fertilizer residue is removed from all metal areas. Use a bristle brush and deter-
gent if necessary.
5. Remove and check all nozzle screens, clean caps and tips in a bucket filled with clean
water and detergent. Use a tip brush if necessary. Rinse with clean water and reinstall.
Summary of Contents for Field Pro II 1000
Page 9: ...A8 SPECIFICATIONS ...
Page 11: ...A10 A C D E P N 67657 A P N DEC HAZ01 A Safety Sign Locations B F ...
Page 12: ...A11 P N SW001 C P N 67671 C P N DEC HAZ02 D P N 67672 C P N 60962 F P N SW900 E P N 67673 B ...
Page 19: ...B6 ...
Page 30: ...C11 Raven 440 Spray Wiring Diagram ...
Page 33: ...C14 Figure 6 ...
Page 34: ...C15 Spraying Systems 744 Wiring Diagram 3 Section Plumbing Figure 7 ...
Page 49: ...D14 ...
Page 52: ...E3 12 Hours 12 Hours ...
Page 53: ...E4 12 Hours both sides of boom center section 12 Hours ...
Page 62: ...G1 PARTS LISTING 1000 Gallon Frame and Tank Assembly ...
Page 66: ...G5 Base Plumbing Details ...
Page 68: ...G7 X Fold Boom Center Section ...
Page 70: ...G9 X Fold Boom Inner Wing Detail ...
Page 72: ...G11 X Fold Boom Outer Wing Detail ...
Page 74: ...G13 X Fold Boom Hydraulic Detail ...
Page 76: ...G15 X Fold Boom Plumbing Schematic ...
Page 78: ...G17 Flex Pro Boom Center Section Assembly ...
Page 80: ...G19 Flex Pro Boom Wing Assembly ...
Page 82: ...G21 Flex Pro Boom Transport Stand Flex Pro Boom Shocked Wheel ...
Page 84: ...G23 Flex Pro Boom Hydraulic Schematic ...
Page 86: ...G25 Flex Pro Boom Hydraulic Hose Routing ...
Page 90: ...G29 Outback Foam Guidance System Model 6 or 10 ...
Page 92: ...G31 9303C HM1C Pump Kit ...
Page 94: ...G33 Inductor Kit ...
Page 96: ...G35 Rinse System Assembly ...
Page 98: ...G37 Deluxe Plumbing Plate with 3 Valve Stack Assembly ...
Page 100: ...H1 Field Pro II Wiring Diagram ELECTRICAL WIRING DETAILS ...
Page 102: ...H3 Field Pro II Wiring Diagram for 3 Section Ball Valve Plumbing ...