64
Operation of the system
– Jungbrunnen 66-10 / 66-11
With the E-Test, you can check all elec-
tric components of the system for their
functions
.
When the (+)-key is pressed again
you can select the preparation for the
maintenance works and acknowledge
with the
OK-key
.
During the preparation for
maintenance works, you will run
through the maintenance and the
filter change of the system (see
chapter Maintenance of the BestWater
system).
With the permeate production, the
purest drinking water is produced
.
When the (+)-key is pressed again,
you can select the Flushing programs
and acknowledge with the
OK-key
.
Under Flushing programs, you can
change Flushing times for the indi-
vidual Flushing kinds and carry out
individual Flushing kinds by hand
.
When the (+)-key is pressed again
you can empty the tank (only Jungb-
runnen 66-11) and
acknowledge
the
process with the
OK-key
.
If you Press the (+)-key again, you
will get to the program E-Test , func-
tions. You can acknowledge
this with
the
OK-key
.
Please note that the system is not
designed for continuous operation
.
A
A
A
B
B
B
ESC
ESC
ESC
-
-
-
+
+
+
OK
OK
OK
Digital X-Pro 20b Controller
Digital X-Pro 20b Controller
Digital X-Pro 20b Controller
Flushing programs
ESC <-
-> oK
Empty the tank
ESC <-
-> oK
E-test, functions
ESC <-
-> oK
A
B
ESC
-
+
OK
Digital X-Pro 20b Controller
Preparation for the
maintenance
ESC <-
-> oK
EN – Englisch
Summary of Contents for Jungbrunnen 66-10
Page 42: ...42 Wartungstabelle DE Deutsch Datum Art der Wartung Stempel N chster Termin...
Page 43: ...43 Wartungstabelle Datum Art der Wartung Stempel N chster Termin DE Deutsch...
Page 44: ...44 Wartungstabelle Datum Art der Wartung Stempel N chster Termin DE Deutsch...
Page 85: ...85 EN Englisch Maintenance schedule Date Type of maint Stamp Next date...
Page 86: ...86 Maintenance schedule Date Type of maint Stamp Next date EN Englisch...
Page 87: ...87 Maintenance schedule Date Type of maint Stamp Next date EN Englisch...