background image

This manual is copyrighted. Under the copyright laws, this manual
may not be copied, in whole or in part, without consent from Reynolds

Building Systems, Inc.

©  Copyright 2018

South Dakota II

Building Size 12'x16'

Revised June 19, 2019

Assembly Book

Manufactured by Reynolds Building Systems, Inc.

205 Arlington Drive          Greenville, PA   16125

800-245-1577

Summary of Contents for South Dakota II

Page 1: ...ot be copied in whole or in part without consent from Reynolds Building Systems Inc Copyright 2018 South Dakota II Building Size 12 x16 Revised June 19 2019 Assembly Book Manufactured by Reynolds Buil...

Page 2: ...ld optionally You may choose to build your own or pour a cement pad Windows and Walk in Door are purchased separately Terminology Square Confirming corners are 90 degrees Plumb Confirming walls gables...

Page 3: ...oenail frame to the 4x4 runners Install the flooring with 8d galvanized nails spaced 8 apart 3 Cut 2x4 12 floor joist to 11 9 Treated lumber may be thicker than 1 1 2 Take this into account when cutti...

Page 4: ...es with 2 two 10d sinkers on each end Step 2 Assemble Door Header 185 Wall Plate Do not discard any material until construction is complete including short 2x4 blocks Top Wall Plate Bottom Plate 75 Lo...

Page 5: ...Plate 2 Install 7 seven pre cut wall studs between the top bottom plates Nail top and bottom plates to studs using 10d sinkers 3 Square wall frame Measure the wall diagonally corner to corner Then mea...

Page 6: ...44 for wall plates Position the boards together and indicate with X Marks where the wall studs will be located Install these Studs Centered 2x4 Blocks 2 Install 6 six pre cut wall studs between the wa...

Page 7: ...p plate Nail OSB to back wall and all 2x4s using 6d common nails spaced 8 apart 3 Install 3 three more OSB panels Last panel will extend 3 1 2 past wall to receive front wall panel 4 Start at back wal...

Page 8: ...ngle cut at one end Nail through the bottom plate with 10d sinkers and secure the top with barbed metal drive on plates Step 6 Assemble Roof Gables 23 1 2 Gable Stud Bottom Gable Plate Barbed Metal Pl...

Page 9: ...rafter and collar tie in place See Detail B 2 Secure the 2x4 truss rafters at the top with a 8 x 20 wood gusset Apply wood glue between the 2x4s and the gusset Nail the gusset to the 2x4s with 14 fou...

Page 10: ...front and back wall Cut the last filler to fit between the soffit on the sidewalls Front Wall Door Opening 7 Soffit 3 1 2 Filler Tongue Edge Flush 1 Install a 7 wide x 48 3 4 siding panel over the si...

Page 11: ...common nails 2 Repeat to install siding on the other gable frame 1 Cut a 2x4 16 board to fit between the gables on the front and back wall Install the 2x4s flush with the inside of soffit Use 10d sink...

Page 12: ...ith 1 1 2 hanger nails The opening should line up with the X mark the bottom of the opening flush with the 2x4 tie plate Detail D 24 19 Measure from Backside of 2x4 Detail D 2x4 Tie Plate 3 Set roof t...

Page 13: ...t each board against the keystone and flush with the top of the gable frame Use 6d galv nails Side Wall Back Wall The front gable trim will be installed in a later step Keystone 82 1 2 Long 1x4 Trim R...

Page 14: ...Side Walls Step 15A Install Roof Sheathing 2 Plumb each truss and gables 3 Refer to sheathing layout at the top of the next page Install roof sheathing starting at the front gables lower corner The ro...

Page 15: ...gh roof sheathing Set these boards flush with soffit panels The roof sheathing will extend 3 4 past the 2x3s to allow for trim Front Gable Nail with 6d Common 7 Wide Soffit Panels 42 3 8 Long 2x3 Shea...

Page 16: ...all the galv door sill over flashing in the center of the door opening Use 1 1 4 pan head screws along the front edge Galv Sill 79 5 8 Long Jamb 1x4 Cut to Fit 2 Install a 3 7 8 x 72 primed jamb mater...

Page 17: ...spacer 2x3 Track Support Assembly 2 Install the other track support assembly 2x8 Door Header View From Inside View From Inside Screw Used as Spacer Treated Sill Board Notch in Sill Building Tip run a...

Page 18: ...the bottom of the door does not rub on the treated threshold Tighten the screws Tip Inserting a screw shown below will prevent the doors from falling through the opening between the track if the door...

Page 19: ...half to receive locking latch and screw heads will be covered Sliding Bolt on the back of left door 4 1 2 sq Vinyl Siding double 4 standard profile 4 ea Outside Corners 5 ea J Channel 3 ea Under Sill...

Page 20: ...nger Nails 100 ea 1 1 2 Exterior Screws 25 ea 2 1 2 Deck Screws 6 ea 1 x4 Metal Plates 14 ea H1 Metal Truss Hangers 2 ea Bottle Glue 2 ea 1x6 Keystone 8 1 2 14 ea Gussets 7 16 10 x 24 28 ea Gussets 7...

Reviews: