38477BA2B
2 – 126
25.5.09
1 System Description
Volume 2
1.4
Measuring Arrangements
To be able to cover a certain measuring range continuously, a mea-
suring arrangement must be realized where the dimensions of
source and detector form a geometry, which covers a measuring
field of equal size. The different options that are available will be
described below.
Which of these arrangements is chosen depends on the size of the
measuring range and on the measuring geometry resulting from
the measuring task. Moreover, constructional circumstances and
customer-specific requirements may have an effect on the device
selection.
The respective selections are made during the planning stage and
must be observed during assembly and commissioning.
The following scintillator types are available for the level gauge
Uni-Probe LB 490:
1) KS = collimator with radiation window
radial
KA = collimator with radiation window
axial
1.4.1
Rod Source Arrangement
Figure 1-5 shows a basic arrangement with
rod-shaped source and
point-shaped detector
, as well as the respective characteristic
curve. The length of the rod source is adapted to the size of the
required measuring range. The non-linearities resulting from the
measuring geometry and the dissemination and absorption condi-
tions of the radiation are compensated for by means of a non-linear
activity distribution along the rod source, including the critical zone
around the bottom end of the measuring range.
Thus, the intensity changes at the detector are already in linear
proportion to the level changes. The evaluation electronics can
work linear. Electronic linearization is not required. Therefore, it is
much easier to take the level gauging system into operation or to
replace devices.
ID no.
Size
Description
38477-X1X, 47678-X1X, 500XX-X1X
50x50mm NaI
Point detector (KS)
1
38477-X2X, 47678-X2X, 500XX-X2X
50x50mm NaI
Point detector (KA)
1
38477-X3X, 47678-X3X, 500XX-X3X
500mm plastic
Rod detector
38477-X5X, 47678-X5X, 500XX-X5X
1000mm plastic
38477-X7X, 47678-X7X, 500XX-X7X
1500mm plastic
38477-X9X, 47678-X9X, 500XX-X9X
2000mm plastic
53214-XXX
150x150mm plastic
Super-Sens
50250-XXX
1000mm or 2000mm plastic
Tower-Sens
Summary of Contents for Uni-Probe LB 490
Page 2: ......
Page 17: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 1 Safety Manuals...
Page 18: ...38477BA2B 1 18 25 5 09 Volume 1...
Page 22: ...38477BA2B 1 22 25 5 09 1 About this User s Manual Volume1...
Page 28: ...38477BA2B 1 28 25 5 09 4 Transport and Assembly Volume1...
Page 44: ...38477BA2B 1 44 25 5 09 6 Radiation Protection Volume1...
Page 56: ...38477BA2B 1 56 25 5 09 7 Source Replacement Volume1...
Page 82: ...38477BA2B 1 82 25 5 09 9 Functional Safety Volume1...
Page 90: ...38477BA2B 1 90 25 5 09 11 Certificates Volume1...
Page 91: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 1 91 Volume 1 11 Certificates 1...
Page 92: ...38477BA2B 1 92 25 5 09 11 Certificates Volume1...
Page 93: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 1 93 Volume 1 11 Certificates 1...
Page 94: ...38477BA2B 1 94 25 5 09 11 Certificates Volume1...
Page 95: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 1 95 Volume 1 11 Certificates 1...
Page 96: ...38477BA2B 1 96 25 5 09 11 Certificates Volume1...
Page 97: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 1 97 Volume 1 11 Certificates 1...
Page 98: ...38477BA2B 1 98 25 5 09 11 Certificates Volume1...
Page 99: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 1 99 Volume 1 11 Certificates 1...
Page 100: ...38477BA2B 1 100 25 5 09 11 Certificates Volume1...
Page 101: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 1 101 Volume 1 11 Certificates 1...
Page 102: ...38477BA2B 1 102 25 5 09 11 Certificates Volume1...
Page 103: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 1 103 Volume 1 11 Certificates 1...
Page 104: ...38477BA2B 1 104 25 5 09 11 Certificates Volume1...
Page 105: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 1 105 Volume 1 11 Certificates 1...
Page 106: ...38477BA2B 1 106 25 5 09 11 Certificates Volume1...
Page 107: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 1 107 Volume 1 11 Certificates 1...
Page 108: ...38477BA2B 1 108 25 5 09 11 Certificates Volume1 11 2 FM Certificate...
Page 109: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 1 109 Volume 1 11 Certificates 1...
Page 112: ...38477BA2B 1 112 25 5 09 11 Certificates Volume1 11 4 EG Declaration of Conformity...
Page 115: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 1 115 Volume 1 1 Notes...
Page 117: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 2 Uni Probe Installation...
Page 118: ...38477BA2B 2 118 25 5 09 Volume 2...
Page 138: ...38477BA2B 2 138 25 5 09 1 System Description Volume2...
Page 254: ...38477BA2B 2 254 25 5 09 6 Technical Drawings Volume2 6 2 Rod Detector...
Page 286: ...38477BA2B 2 286 25 5 09 6 Technical Drawings Volume2 6 10 Shielding for Rod Source on Dip Tube...
Page 288: ...38477BA2B 2 288 25 5 09 6 Technical Drawings Volume2...
Page 292: ...38477BA2B 2 292 25 5 09 7 Cooling Water Curves Volume2...
Page 293: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 2 293 Volume 2 2 Notes...
Page 295: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 3 HART Communicator User Interface...
Page 296: ...38477BA2B 3 296 25 5 09 Volume 3...
Page 340: ...38477BA2B 3 340 25 5 09 3 Getting Started via the HART Communicator Volume3...
Page 403: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 3 403 Volume 3 3 Notes...
Page 405: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 4 PACTware User Interface FDT DTM...
Page 406: ...38477BA2B 4 406 25 5 09 Volume 4...
Page 408: ...38477BA2B 4 408 25 5 09 1 PC Connection to the Uni Probe Volume4...
Page 416: ...38477BA2B 4 416 25 5 09 2 Installing and Working with DTM Volume4...
Page 417: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 4 417 Volume 4 4 Notes...
Page 419: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 5 SIMATIC PDM User Interface HART...
Page 422: ...38477BA2B 5 422 25 5 09 1 Hardware Configuration Volume5...
Page 490: ...38477BA2B 5 490 25 5 09 4 Menu Overview Volume5...
Page 512: ...38477BA2B 5 512 25 5 09 5 Calibration with SIMATIC PDM Volume5...
Page 526: ...38477BA2B 5 526 25 5 09 7 Working with SIMATIC PDM Volume5...
Page 542: ...38477BA2B 5 542 25 5 09 8 Explanations Volume5...
Page 550: ...38477BA2B 5 550 25 5 09 9 Error Handling Volume5...
Page 551: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 5 551 Volume 5 5 Notes...
Page 553: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 6 SIMATIC PDM User Interface Profibus PA...
Page 600: ...38477BA2B 6 600 25 5 09 3 Device specific Menus Volume6...
Page 624: ...38477BA2B 6 624 25 5 09 4 Calibration with SIMATIC PDM Volume6...
Page 648: ...38477BA2B 6 648 25 5 09 6 Explanations Volume6...
Page 654: ...38477BA2B 6 654 25 5 09 7 Error Handling Volume6...
Page 655: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 6 655 Volume 6 6 Notes...
Page 657: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 7 FOUNDATION Fieldbus User Interface...
Page 664: ...38477BA2B 7 664 25 5 09 2 Installation Program Start Volume7...
Page 672: ...38477BA2B 7 672 25 5 09 3 Parameter Overview Volume7...
Page 688: ...38477BA2B 7 688 25 5 09 4 Calibration with FOUNDATION Fieldbus Volume7...
Page 700: ...38477BA2B 7 700 25 5 09 5 Functional Processes Volume7...
Page 720: ...38477BA2B 7 720 25 5 09 7 Error Handling Volume7...
Page 721: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 7 721 Volume 7 7 Notes...
Page 728: ...Index Volume 1 7 38477BA2B I 728 25 5 09...
Page 729: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 729 Volume 1 7 Notes...