Page 19 von 30
13.06.2014
Ver. 2.9
Copyright ©Berner Kochsysteme 2018
Please observe the following points when installing this BERNER unit:
Follow the installation instructions
A partition sheet must be installed under the unit in order to fix the security thermostat
supplied together with the unit, easily accessible.
This partition sheet must be removable as
technical assistance may require accessing the unit. If this is not feasible, other solutions
must be checked. We are at your disposal for a support.
The face plate/control panel is not included, but available as an optional.
In order to assure perfect functioning, carefully observe the present instruction manual.
We suggest to prepare the opening with a small overhang of 10-12 mm height around the
opening itself, in order to avoid any penetration of liquids. Apply a continuous gasket of heat
resistant silicone (i.e. Pactan 6076, available through BERNER) and also close the outside gap
between unit and worktop with the same silicone.
Penetration of liquids could damage the unit.
Installation instructions
Please observe the following points:
-
Make sure that the main voltage corresponds to the voltage indicated on the
nameplate of the equipment.
-
All electric installations must fulfil the local building code regulations. All regulations issued
by the national electricity authorities must be observed.
-
The unit is equipped with a main cable and a plug which can be plugged into a socket.
-
When using fault-current circuit breakers, they must be designed for a minimum fault
current of 30 mA.
-
The operators must ensure that all installation, maintenance and inspection tasks are done
by authorized and trained personnel only.
Specific point for digital touch control
-
The cables for the display must be installed separately from other cables.