INST
ALLA
TION MANUAL
22
ON
OFF
1
2
3
4
5
0
6
Checks during and after initial start-up
Once the system has been started up, perform the fol-
lowing checks:
- Check that the flow rate in the solar heating circuit is
equivalent to 30 l/h for each m
2
of collector area.
- Check that the solar heating circuit has been properly
bled.
- Check that the cold pressure of the system is approxi-
mately 3 bar.
- Check that the safety valve operates at 6 bar.
- Check that all pipes in the water circuit have been insu-
lated in conformity to relevant standards.
Provided all the above checks have been completed
successfully, re-start the boiler and the storage cylinder
and check the temperature settings and domestic hot
water draw rate.
Summary of Contents for IDRA N DS 1500
Page 1: ...STORAGE CYLINDER IDRA DS SOLAR INSTALLATION MANUAL...
Page 27: ......