31
English
the value displayed is different, proceed to modify it
as indicated in the chapter “Adjustments”, in the
sections for parameters HH and LL
- carry out the combustion analysis.
Subsequently:
- remove the analyser probes and close the combustion
analysis sockets with the designated screw
- close the instrument panel, reassemble the cover and
boiler shell, following the procedure described for
dismantling it in reverse order.
The fumes analysis probe must be fully inserted.
IMPORTANT:
the function that switches off the boiler
when water temperature reaches a maximum of about
90 °C is still enabled during the combustion analysis
phase.
18
.
SERIAL NUMBER PLATE
Pmw = 6 bar T= 60 °C
Qn =
0694
N.
230 V ~ 50 Hz
NOx:
Gas type:
Gas category:
05/BB1
05/CA3
IP X5D
P. min. G20=13
,
5 mbar
0694BQ0479
Pms = 3 bar T= 90 °C
Pn =
B23-C13-C23-C33-C43-C53-C63-C83
C13x-C33x-C43x-C53x-C63x-C83x
PT-ES-SK-CZ-SI:
G20=20mbar G31=37mbar
DK:
G20=20mbar
HR-YU-RU-RO:
G20=20mbar G31=37mbar
II2H3P
I2H
II2H3P
II2HS3P
HU:
G20=25mbar G25.1=25mbar G31=37 mbar
Summary of Contents for EXCLUSIVE GREEN 16 RSI
Page 91: ...91 EXCLUSIVE GREEN C S I ...
Page 92: ...92 EXCLUSIVE GREEN R S I ...
Page 98: ......
Page 99: ......
Page 100: ...Cod 10027492 36 05 Ed 2 ...