background image

IT

ALIANO

ENGLISH

CONNECT 3D LE

CONNECT 2D LE

CONNECT 1D LE

CONNECT

1D - 2D - 3D

LE

IT

ISTRUZIONI PER L’INSTALLATORE E PER IL 

SERVIZIO TECNICO DI ASSISTENZA

EN

INSTRUCTIONS FOR THE INSTALLER AND FOR 

TECHNICAL ASSISTANCE

Summary of Contents for 20083968

Page 1: ...O ENGLISH CONNECT 3D LE CONNECT 2D LE CONNECT 1D LE CONNECT 1D 2D 3D LE IT ISTRUZIONI PER L INSTALLATORE E PER IL SERVIZIO TECNICO DI ASSISTENZA EN INSTRUCTIONS FOR THE INSTALLER AND FOR TECHNICAL ASS...

Page 2: ...E a a AVVERTENZA PER L UTENTE questo dispositivo non necessi ta di alcuna regolazione o controllo da parte dell utente per tanto vietato aprire il coperchio frontale del dispositivo b b Controllare pe...

Page 3: ...esto caso aerare il locale aprendo porte e finestre chiudere il dispositivo d intercettazione combustibile fare intervenire con sollecitudine il Servizio Tecnico di Assisten za B oppure personale prof...

Page 4: ...iasi ope razione di installazione e manutenzione CONNECT 3D LE CONNECT 2D LE CONNECT 1D LE 1 3 2 2 4 5 6 7 11 10 9 8 1 3 4 5 6 11 9 8 1 2 4 6 11 8 5 5 1 Rubinetto di scarico 2 Bottiglia di miscela 3 C...

Page 5: ...ta impianto diretto 3 3 4 Rd1 Ritorno impianto diretto 1 3 4 Rd2 Ritorno impianto diretto 2 3 4 Rd3 Ritorno impianto diretto 3 3 4 b b La lunghezza massima dei collegamenti idraulici tra caldaia e CON...

Page 6: ...Curva di prevalenza costante BASSA CP2 Curva di prevalenza costante MEDIA CP3 Curva di prevalenza costante ALTA CC1 Curva 1 4 metri CC2 Curva 2 5 metri CC3 Curva 3 6 metri CC4 Curva 4 MAX 7 metri 0 0...

Page 7: ...A BL BL BL GI VE GI VE GI VE blu MA MA BL MA Fusibile 3 15A F GI VE BL GI VE MA VI BL MA NE GI VE GI VE GI VE GI VE BL BL MA MA BL BL BL BL BL BL BI BI RS MA MA NE NE BL MA MA MA TA2 dopo aver rimosso...

Page 8: ...MA MA BL TBT1 TBT2 2 3 5 6 TA 1 RS MA 7 1 BL Cavo ingresso di rete 230V MA GI VE GI VE MA MA BL BL GI VE MA BL BL MA NE NE BL MA Fusibile 3 15A F GI VE BL GI VE MA BL 4 TA 2 NE VI A1 BL 3 14 NE 4 11 N...

Page 9: ...R grigio r resistenza nt neutro b b Per il collegamento dei termostati limite fare riferimento al pa ragrafo 2 6 Cavo ingresso di rete 230V MA BL P1 TA1 dopo aver rimosso ponticello ROSSO in morsettie...

Page 10: ...1D L 400 P 160 H 720 Peso netto box 8 Peso netto frutto 18 15 12 Il box un accessorio che viene fornito separatamente su richie sta 2 3 Installazione all interno del box b b Prima di installare il CON...

Page 11: ...sulla bottiglia di miscela Montare le tubazioni 6 e 7 sugli attacchi 6a e 7A posti sulla bottiglia di miscela interponendo le apposite guarnizioni di tenuta fornite a corredo 6a 7a 1 6 7 Posizionare l...

Page 12: ...rmali condizioni di funzionamento VI RS NE BI MA MA MA MA TB MA BL 2 7 Collegamenti elettrici Il CONNECT LE predisposto con dei passacavi in gomma 1 posti nella parte superiore del box per il passaggi...

Page 13: ...di terra salvaguardare l accessibilit alla presa di corrente dopo l installazione a a vietato l uso dei tubi del gas e dell acqua per la messa a terra dell apparecchio b b Il costruttore non responsab...

Page 14: ...entativo di avvio ogni 1 5 secondi Attendere o sblocca re l albero motore LED rosso acceso LED 4 giallo acceso Bassa tensione in ingresso Solo avviso Il circolatore continua a funzionare Verificare la...

Page 15: ...D 4 giallo LED 5 giallo Prevalenza proporzionale Il circolatore lavora in funzione della domanda di calore dell impianto Il punto di lavoro del circolatore e la curva di prevalenza proporzio nale sele...

Page 16: ...denaturato o con prodotti specifici Terminata la pulizia asciugare accuratamente a a Non usare prodotti abrasivi benzina o trielina 4 2 Svuotamento del CONNECT LE Prima di iniziare le operazioni di sv...

Page 17: ...17 ITALIANO...

Page 18: ...Compatibility EMC Directive 2004 108 EC Low Voltage Directive 2006 95 EC FOR THE USER a a INSTRUCTIONS FOR THE USER this device does not require any adjustment or checks to be carried out by the user...

Page 19: ...nd windows close the fuel shut off device immediately call the B Technical Assistance or a profes sionally qualified technician a a Do not touch the appliance when barefoot or with any wet parts of th...

Page 20: ...es any instal lation or maintenance intervention difficult CONNECT 3D LE CONNECT 2D LE CONNECT 1D LE 1 3 2 2 4 5 6 7 11 10 9 8 1 3 4 5 6 11 9 8 1 2 4 6 11 8 5 5 1 Drain cock 2 Mixing bottle 3 Circulat...

Page 21: ...uilt in installation IPX4D Maximum pressure bar 3 Ambient temperature required for installation C greater than 4 CONNECT 3D LE 50 50 50 50 110 170 160 75 85 50 110 400 60 60 60 60 60 CONNECT 2D LE CON...

Page 22: ...portional head curve PP3 HIGH proportional head curve CP1 LOW constant head curve CP2 AVERAGE constant head curve CP3 HIGH constant head curve CC1 Curve 1 4 metres CC2 Curve 2 5 metres CC3 Curve 3 6 m...

Page 23: ...VE GI VE GI VE blu MA MA BL MA Fusibile 3 15A F GI VE BL GI VE MA VI BL MA NE GI VE GI VE GI VE GI VE BL BL MA MA BL BL BL BL BL BL BI BI RS MA MA NE NE BL MA MA MA TA2 dopo aver rimosso ponticello n...

Page 24: ...1 TBT2 2 3 5 6 TA 1 RS MA 7 1 BL Cavo ingresso di rete 230V MA GI VE GI VE MA MA BL BL GI VE MA BL BL MA NE NE BL MA Fusibile 3 15A F GI VE BL GI VE MA BL 4 TA 2 NE VI A1 BL 3 14 NE 4 11 NE A2 NE A2 R...

Page 25: ...BI white GR gray r resistor nt neutral b b For limit thermostats connections refer to 2 6 paragraph Cavo ingresso di rete 230V MA BL P1 TA1 dopo aver rimosso ponticello ROSSO in morsettiera GI VE MA...

Page 26: ...0 P 160 H 720 Net weight of box 8 Net weight of appliance 18 15 12 The box is supplied separately on request as an accessory 2 3 Installation inside the box b b Before installing CONNECT LE inside the...

Page 27: ...tioned on the rack 4 making sure that the nuts 5 are posi tioned below the rack itself 4 5 2 3 Remove the protective plug 1 on the mixing bottle Fit the pipes 6 and 7 on the couplings 6a and 7a locat...

Page 28: ...1000 2 5 Typical installation layout Boiler TA 230V 50Hz IAT 1 zone 1 TA2 CT2 TA3 CT3 TA1 CT1 IAT 3 zone 3 IAT 2 zone 2 TA Ambient thermostat connection TA1 CT1 Ambient thermostat chrono thermostat zo...

Page 29: ...NNECT LE to the electrical power supply Pass the cable 2 which comes out of the electrical connection box 3 through the cable feed through 1 and connect it to the electrical power supply phase neutral...

Page 30: ...ictly prohibited b b The manufacturer declines any liability for damage caused due to the lack of a proper earthing system or failure to comply with the wiring diagrams 3 COMMISSIONING 3 1 First start...

Page 31: ...th the circulation unit powered briefly press the button A to see the active configuration of the circulation unit The LEDs indicate the active settings No changes can be made to the configuration of...

Page 32: ...3 HIGH constant head curve Constant curve The circulation unit works at constant speed irrespective of the heat request from the system The working point of the circulation unit will move along the se...

Page 33: ...or the first time and at least once a year it is advis able to check that the shaft of the circulation units rotate This is nec essary because especially after lengthy periods of inactivity deposits a...

Page 34: ...34 ENGLISH 34...

Page 35: ...35 35 ENGLISH...

Page 36: ...fezionamento di tutta la sua produzione le caratteristiche esteti che e dimensionali i dati tecnici gli equipaggiamenti e gli accessori possono essere soggetti a variazione The manufacturer strives to...

Reviews: