24
Installation
6003295_g – 19.03.2019
3.5.10 Establish electrical power supply
☞
Observe the voltage specifications on the rating plate.
☞
Plug the connecting cable mains plug into the device.
☞
Plug the other end of the connecting cable into the
socket.
☞
Route the cable such that it is not kinked, crushed or
damaged and so that it will not get in the way when
replacing the filter filling.
☞
Make sure that the device can be disconnected on all
poles from the electricity supply after installation.
The device is ready for operation.
3.5.11 Check and carry out commissioning
D
ATTENTION!
Risk of disruptions due to moisture in the device!
If the device is moved from a cold environment into a hot
one, condensation may form inside.
☞
Wait about 2-3 hours before bringing the device into
service.
☞
Remove the protective film from the device.
☞
Check that the mains plug is freely accessible or that
an all-pole isolating device (min. 3 mm contact gap) is
present.
☞
Check that the mains cable and the electrical connection
cable are not kinked, crushed or damaged.
☞
Make sure that the angle trim strip can be removed.
☞
Make sure that the area behind the front is accessible at
all times (e.g. by means of a detachable cover).
☞
Ensure that air outlets are not closed or covered.
With devices for recirculated air mode:
☞
Make sure that the ventilation slots are free.
☞
Make sure that the recirculated air filter is accessible at all
times.
☞
Check the correct functioning of the device.