![Berbel BWH 90 GL Operating And Installation Instructions Download Page 18](http://html1.mh-extra.com/html/berbel/bwh-90-gl/bwh-90-gl_operating-and-installation-instructions_2736446018.webp)
18
Installation
6005737_0 – 31.03.2021
3.5.12 Check and carry out commissioning
D
ATTENTION!
Risk of disruptions due to moisture in the device!
If the device is moved from a cold environment into a hot
one, condensation may form inside.
☞
Wait about 2-3 hours before bringing the device into
service.
☞
Remove the protective film from the device.
☞
Check that the mains plug is freely accessible or that
an all-pole isolating device (min. 3 mm contact gap) is
present.
☞
Check that the mains cable and the electrical connection
cable are not kinked, crushed or damaged.
☞
Ensure that air outlets are not closed or covered.
☞
With recirculated air devices: Make sure that the
ventilation slots are free.
☞
Make sure that the protective film is removed.
☞
Check the correct functioning of the device.
D
Summary of Contents for BWH 90 GL
Page 32: ...6005737_0 31 03 2021 ...