12
Installation
6005735_0 – 31.03.2021
3.5.3
Determining the hanging position
The device is designed to be hung on ceilings.
When mounting on a solid ceiling:
☞
Make sure that the ceiling has sufficient load bearing
capacity.
☞
Use the fastening materials provided.
With different installation situations:
☞
Enquire about alternative fastening systems (e.g. consult
with your architect).
☞
Only use fastening hardware suitable for the type of
ceiling.
Front panel, rear panel and side chimney panels have been
adjusted to the respective ceiling height in the factory.
The chimney stack is preassembled in the factory to a height
of 750 mm.
In order to adjust the height of the chimney stack to the
assembly situation, perform the following steps:
☞
Unscrew the screws and nuts for the corner connections.
☞
Adjust to the desired height in 50 mm steps.
☞
Secure the corner connections once more with the
screws and nuts.
☞
Make sure that the chimney stack is bolted tight.
View from the front
x
=
=
Safety distance (x):
y
Recommendation 700 mm.
y
With electric hobs, at least 600 mm.
y
With gas hobs, at least 650 mm.
Observe the specifications for the cooking appliances
(e.g. installation above a solid fuel stove).
☞
Make sure that the safety distance is complied with.
View from above
272
=
=
220
=
=
☞
Determine the hanging position.
☞
Mark the centre point of the device on the ceiling.
Summary of Contents for BIH 100 GL
Page 36: ...6005735_0 31 03 2021 ...