36
Bentone BFG1
6.3.1.4 Replacement of coil
• Loosen screw (9).
• Remove the cover.
• Remove the circuit board.
• Loosen the hexagonal screw which holds the solenoid coil and the
valve together.
• Install and fasten the new coil.
• Install and fasten the circuit board and cover.
6.3.1.5 Replacement of gas pressure switch (GW...A5)
• Loosen the two screws (10).
• Carefully remove the gas pressure switch.
• Install a new gas pressure switch.
• Attach the gas pressure switch with the two screws (10).
6.3.1.6 Important
When replacing gas pressure switches, inspecting filters via the gas
connection, etc., ensure that the O-rings and gaskets are positioned
correctly and that leak testing is performed after each operation. Also check
the function of the gas pressure switch and set it.
!
After completion of the jobs on the gas components, perform leakage control and
function control.
Summary of Contents for BFG 1 H1
Page 13: ...13 Bentone BFG1 4 3 5 1 6 2 10 16 9 15 14 13 7 8 22 11 12 2 7 Description ...
Page 47: ...47 Bentone BFG1 Alt 1 Acc to DIN 4791 Alt 2 Alt 3 8 2 Wiring diagram ...
Page 54: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ...Enertech AB P O Box 309 SE 341 26 Ljungby www bentone se www bentone com ...