background image

171 505 45  09-01

INSTRUCTIONS PUMP TYPE SUNTEC A2L 65C  -  75C

Suction line tables

The suction line tables consist of theo-

retically calculated values where the 

pipe dimensions and oil velocity have 

been matched so that tur-bulences will 

not occur. Such tur-bulences will result 

in increased pressure losses and in 

acoustic noise in the pipe system. In 

addition to drawn copper piping a pipe 

system usually comprises 4 elbows, a 

non-return valve, a cut-off valve and 

an external oil fi lter. 

The sum of these individual resi-

stances  is  so  insignifi cant  that  they 

can be disregarded. The tables do not 

include any lengths exceeding 100 

m as experience shows that longer 

lengths are not needed.

The tables apply to a standard fuel 

oil of normal commercial quality 

accor-ding to current standards. On 

commis- sioning with an empty tube 

system the oil pump should not be 

run without oil for more than 5 min. 

(a condition is that the pump is being 

lubricated during operation).

The tables state the total suction line 

length in metres at a nozzle capacity 

of  9,5 Gph. Max. permissible pres-

sure at the suction and pressure side 

is 2,0 bar. 

Components

  1.  Nozzle outlet G 1/8" Stage 2

  2.  Pressure gauge port G 1/8"

  3.  Nozzle outlet G 1/8" Stage 1

  4.  Pressure gauge port G 1/8"

  5.  Vacuum gauge port G 1/8"

  6.  Return line G 1/4"

    and internal by-pass plug

  7.  Suction line G 1/4"

  8.  Return plug

  9.  Pressure adjustment

 10.  Solenoid valve 1

 11.  Solenoid valve 2 

Technical data

One or two-pipe system.

Viscosity range: 

2-12 mm

2

/S

Pressure range: 

8-15 bar

Rated voltage of coil:  

220/240V 

 

50/60 Hz

Oil temperature: 

max 60°C

1-pipe system

  Height 

Pipe diameter

 

ø6 mm

 m 

With an underlying tank a 1-pipe-

system is not recommended

Two-pipe system

Height 

  Pipe diameter

H  ø8mm  ø10mm ø12mm  ø14mm 

m m  m  m  m

 0,0  20 

54 

116 

150

-0,5 17 

48  103  150

-1,0 15 

41 

89 

150

-2,0 9 

28  61  116

-3,0 4 

14  33 

65

-4,0 0 

14

1-pipe system

 Height 

  Pipe  diameter

  H 

ø6 mm  ø8 mm  ø10 mm 

 

m m m m 

 4,0 

45 

144 

150

 3,0 

39 

127 

150

 2,0 

34 

109 

150

 1,0 

28 

92 

150

 0,5 

26 

83 

150

 0,0 

23 

74 

150

Two-pipe system

Height 

  Pipe diameter

H  ø8mm  ø10mm  ø12mm ø14mm

m m  m 

m  m

4,0 42 

108 

150  150

3,0 36 

94 

150  150

2,0 31 

81 

150  150

1,0 26 

68 

144  150

0,5 23 

61 

130  150

0,0 20 

54 

116  150

H

H

Summary of Contents for B30A2.2H

Page 1: ...Providing sustainable energy solutions worldwide 178 066 52 1 2016 04 18 Installation and maintenance instruction B30A2 2H B30A2 2HL...

Page 2: ......

Page 3: ...Cover inspection glass 10 Switch I II 11 Switch I 0 12 Fan wheel 13 Motor 14 Nozzle assembly adjustment 15 Blast tube 16 Photo cell 17 Adjustment device 18 Indication air damper 19 Connecting pipe St...

Page 4: ...range and nozzles recommended The net calori c value of 11 86 kWh kg for light oil has been used 188 415 B 372 108 108 220 303 281 160 190 108 35 Recommended nozzle Because of different boiler types e...

Page 5: ...e an optimum adjust ment is obtained If larger nozzles are used the preadjustment of both the air volume and the nozzle assembly must be increased A whistling sound may be heard which can be eliminate...

Page 6: ...e an optimum adjust ment is obtained If larger nozzles are used the preadjustment of both the air volume and the nozzle assembly must be increased A whistling sound may be heard which can be eliminate...

Page 7: ...ge Set the operating switch S2 on low capacity I Loosen the screw A and turn the damper to the position wan ted Tighten the screw A again Second stage Set the operating switch S2 on high capacity II S...

Page 8: ...at the main switch and cut off the oil supply Open the cover and disconnect the connecting pipes by loosening screw A and nut B Service of burner head 171 305 47 09 01 1 Loosen or swing out the burne...

Page 9: ...l burner control LMO24 255 Wiring diagram ELECTRIC EQUIPMENT 1 3 1N 50 60 Hz 230 V If the boiler is not equipped with wired contacts connect the enclosed contacts to terminals X4 and X6 in accordance...

Page 10: ...on till the prepurge period expires and the solenoid valve 1 opens 2 2 Solenoid valve 1 opens Oil mist is formed and ignited The photocell indicates a ame 3 The safety time expires a If no ame is est...

Page 11: ...the problem by pressing and holding the reset button for 3 seconds The number of ashes below is repeated with a pause in between 2 ashes No ame signal when safety time expires 4 ashes False light dur...

Page 12: ...length in metres at a nozzle capacity of 9 5 Gph Max permissible pres sure at the suction and pressure side is 2 0 bar Components 1 Nozzle outlet G 1 8 Stage 2 2 Pressure gauge port G 1 8 3 Nozzle out...

Page 13: ...it is assured by a bleed at on the piston In one pipe operation a high pressure connection must be loosened until the air is evacuated from the system Cut Off The solenoid valves of the A2L pump are o...

Page 14: ...93 9 71 115 99 10 24 121 104 10 73 127 109 3 00 9 98 118 102 10 59 126 108 11 16 132 114 11 71 139 119 3 50 11 65 138 119 12 35 146 126 13 03 154 133 13 66 162 139 4 00 13 31 158 136 14 12 167 144 14...

Page 15: ...1 21 133 114 11 67 138 119 12 11 144 123 12 53 148 128 3 00 12 23 145 125 12 73 151 130 13 21 157 135 13 67 162 139 3 50 14 27 169 145 14 85 176 151 15 42 183 157 15 95 189 163 4 00 16 31 193 166 16 9...

Page 16: ...of magnetic valve Burner fails to start Lamp not lit Motor runs Burner runs to lockout Fuse has blown Appliance thermostat has not reset Appliance overheat device has operated Control relay or photoce...

Page 17: ...sont conformes aux normes et aux documents normatifs suivants et satisfont aux crit res applicables des directives CE suivantes Dokument EN 267 EN 60335 EU direktiv EU Directives EU Direktiven CE suiv...

Page 18: ...he burner will not start Press the reset button on the relay Check that the thermostats are correctly adjusted Don t forget the room thermostat check that any fusesare intact and main switch is on If...

Page 19: ......

Page 20: ...Enertech AB P O Box 309 SE 341 26 Ljungby www bentone se www bentone com...

Reviews: