Rigging and Sails
6
53
RIGGING DIAGRAM (All versions)
I
I
F
F
H
C
H
D
D
11
10
4
J
C
5
2
8
6
3
9
12
7
A
B
B
A
E
E
13
1
G
G
K
RE F
Designation
1
Kicking strap
2
Genoa furler line
3
Spinnaker halyard - To port
4
Main halyard
5
Reef
6
Mainsail foot
7
Jib sheet inhaulers
8
Jib sheet inhaulers
9
Reef
10
Genoa halyard
11
Spinnaker halyard - To starboard
12
Boom lift
13
Kicking strap
RE F
Designation
A
Spinnaker boom downhaul
B
Jib sheet inhaulers
C
Back and forth Genoa traveller (Forward)
D
Genoa sheet
E
Spinnaker guy
F
Spinnaker barber
G
Back and forth Genoa traveller (Aft)
H
Main sheet
I
Spinnaker sheet
J
Mainsail traveller pass rope
K
Backstay adjustment
Summary of Contents for FIRST 35
Page 1: ...FIRST 35 Code 091962 Owner s Manual ...
Page 2: ......
Page 4: ......
Page 7: ...3 Introduction HISTORY OF UPDATES Index A 08 2009 ...
Page 8: ......
Page 10: ......
Page 11: ...7 General specifications Technical specifications Certification Design category Your boat 1 ...
Page 26: ...22 Safety Use of the manual bilge pump Lay out of Operation ...
Page 28: ...24 Safety Acces to sector ...
Page 30: ......
Page 31: ...27 Hull Maintenance of the Hull Carreening 3 ...
Page 32: ...28 Hull Carreening Wetted area 27 5 m ...
Page 34: ......
Page 42: ......
Page 44: ......
Page 45: ...41 Steering system Steering Gear 5 ...
Page 46: ...42 Steering system Steering Gear ...
Page 47: ...Steering system 5 43 Detail B Detail C Detail D ...
Page 51: ...47 Rigging and Sails Standing rigging Running rigging Winches Sail setting Sails 6 ...
Page 52: ...48 Rigging and Sails Rigging Cruising DWL 1 2 3 4 5 ...
Page 54: ...50 Rigging and Sails Rigging Racing carbon DWL DWL 1 2 3 DWL 4 5 ...
Page 67: ...63 Fittings Introduction Interior maintenance Maintenance of fabrics 7 ...
Page 68: ...64 Fittings INTRODUCTION Fittings ...
Page 72: ......
Page 73: ...69 Water and sewage water Water tank Water system Distribution Water system Drainage Sewage 8 ...
Page 78: ......
Page 84: ......
Page 85: ...81 Electrical equipment General information 12 V DC system 110 220 VAC system Equipment 9 ...
Page 86: ...82 Electrical equipment Schematic diagram 12V T 30 ma 40A 220 Volts 50Hz ...
Page 98: ...94 Electrical equipment Electronics Transducer location View interior View Outside ...
Page 100: ......
Page 101: ...97 Engine General information Engine fitting 10 10 ...
Page 102: ...98 Engine Fuel tank Fuel filler Gauge Electrical panel Refer to the instructions for use ...
Page 104: ...100 Engine ENGINE FITTING ...
Page 105: ...101 Engine 10 10 ...
Page 106: ...102 Engine ...
Page 115: ...111 Launching Launching recommendations Stepping the mast 11 11 ...
Page 116: ...112 Launching POSITION OF HOISTING CRADLE AND STRAPS ...
Page 119: ...115 Winter Storage Laying up Protection and maintenance 12 12 ...
Page 120: ......
Page 122: ......