59
Rigging and Sails
6
F
URLING
GE NOA
: F
ITTING
- Secure the head and halyard to the swivel. Secure the tack to the drum and sheets.
- Insert the bolt rope into the hole and hoist it and take care that you do not tear it.
- Have the halyard taut enough but hoist less taut than a sail on a normal stay. Hoist it until the horizontal creases
disappear (Adjust the tension of the luff after a few sea trips).
- Pull on the line from the cockpit to furl the genoa.
- Before getting under way take advantage of a windless period of time and hoist the genoa.
- Hand pre-roll the drum to set the furling line on it.
Pay attention to the drum winding direction: The sacrificial strip of the genoa shall be wrapped outside.
Never force it in case it seizes when you furl or unfurl the head sails. Make sure that no ropes are caught in the furler.
M
AINTE NANCE
- Regularly rinse the drum and swivel.
- Lubricate the bearings if recommended by the manufacturer.
- Unrig the sails if your boat is not to be used for long.
L
AZY
-
BAG
: F
ITTING
- Spread out the lazy-bag on the deck.
- Slide the battens in and close the batten pockets.
- Hank on the lazy-bag until you have the front part about level with the gooseneck.
- Fasten the lazy-bag to the tack with the strap provided.
- Stretch the lazy-bag from the back before you fasten the lazy-jacks.
- Put the mainsail into the lazy-bag.
P
IE CE
OF
ADVICE
-
R
E COMME NDATION
-When you are not sailing, slacken the genoa
halyard.
-Install the lazy-bag before the mainsail.
-When the sail is unfurled, adjust the halyard
tightness.
-Too much tightness may cause furling
problems.
-After taking in a reef for the first time mark the
halyard position at the clutch (marker pen or
light stitched label)in order to be able to let out
the sheet with precision in subsequent
manoeuvres.
P
IE CE
OF
ADVICE
-
R
E COMME NDATION
-Carry out the complete maintenance of the
winches regularly (before and during the sailing
season).
-Rinse the winches off regularly during the
season.
Summary of Contents for FIRST 35
Page 1: ...FIRST 35 Code 091962 Owner s Manual ...
Page 2: ......
Page 4: ......
Page 7: ...3 Introduction HISTORY OF UPDATES Index A 08 2009 ...
Page 8: ......
Page 10: ......
Page 11: ...7 General specifications Technical specifications Certification Design category Your boat 1 ...
Page 26: ...22 Safety Use of the manual bilge pump Lay out of Operation ...
Page 28: ...24 Safety Acces to sector ...
Page 30: ......
Page 31: ...27 Hull Maintenance of the Hull Carreening 3 ...
Page 32: ...28 Hull Carreening Wetted area 27 5 m ...
Page 34: ......
Page 42: ......
Page 44: ......
Page 45: ...41 Steering system Steering Gear 5 ...
Page 46: ...42 Steering system Steering Gear ...
Page 47: ...Steering system 5 43 Detail B Detail C Detail D ...
Page 51: ...47 Rigging and Sails Standing rigging Running rigging Winches Sail setting Sails 6 ...
Page 52: ...48 Rigging and Sails Rigging Cruising DWL 1 2 3 4 5 ...
Page 54: ...50 Rigging and Sails Rigging Racing carbon DWL DWL 1 2 3 DWL 4 5 ...
Page 67: ...63 Fittings Introduction Interior maintenance Maintenance of fabrics 7 ...
Page 68: ...64 Fittings INTRODUCTION Fittings ...
Page 72: ......
Page 73: ...69 Water and sewage water Water tank Water system Distribution Water system Drainage Sewage 8 ...
Page 78: ......
Page 84: ......
Page 85: ...81 Electrical equipment General information 12 V DC system 110 220 VAC system Equipment 9 ...
Page 86: ...82 Electrical equipment Schematic diagram 12V T 30 ma 40A 220 Volts 50Hz ...
Page 98: ...94 Electrical equipment Electronics Transducer location View interior View Outside ...
Page 100: ......
Page 101: ...97 Engine General information Engine fitting 10 10 ...
Page 102: ...98 Engine Fuel tank Fuel filler Gauge Electrical panel Refer to the instructions for use ...
Page 104: ...100 Engine ENGINE FITTING ...
Page 105: ...101 Engine 10 10 ...
Page 106: ...102 Engine ...
Page 115: ...111 Launching Launching recommendations Stepping the mast 11 11 ...
Page 116: ...112 Launching POSITION OF HOISTING CRADLE AND STRAPS ...
Page 119: ...115 Winter Storage Laying up Protection and maintenance 12 12 ...
Page 120: ......
Page 122: ......