Quatra™ Full-Rise Scissor Lift
27
P/N 5900085 — Rev. A1 — October 2019
To connect the Hydraulic Hoses to the Console
:
1.
Find the two Hydraulic Hoses at the Rear of each Frame.
Important
:
If you placed the Console on the left side of the Lift
, make sure to undo the
Hydraulic Hoses from each Frame and swap them
before
you route the Hydraulic
Hoses through the Hose Troughs. It is important that you reinstall the Hoses at the
same locations from which you removed them; the longer Hydraulic Hose of each set
connects to the top of the Front Hydraulic Cylinder (a Tee Fitting), and the shorter
Hose connects to the bottom of the same Cylinder. Refer to the previous drawing for
more information.
2.
Uncoil the roll of Hydraulic Hoses and then push the Hoses all the way through the Hose Trough.
Do the same for the other Frame.
3.
Gather the Hydraulic Hoses at the bottom of the Hose Troughs and bring them to the opening at
the bottom of the Console, then push the Hoses through the opening.
4.
Open the front doors of the Console to have access to the Valve Block inside, if you have not
already done so.
5.
Connect the four pre-marked Hoses to the corresponding marked port on the Valve Block.
(Example: Hose S1 connects to the S1 Hydraulic Port on the Valve Block.)
6.
The Power Unit should already be connected to the Valve Block.
If it is not
, attach a Hydraulic Elbow Fitting (-06 JIC x -06 ORB) to the closest Hydraulic Power
Out connector on the Power Unit, attach a Hydraulic Elbow Fitting (-06 NPT L x -04 JIC) to the top
of the Valve Block, then connect the two Elbow Fittings using Hose A.
See
for more about the connector locations.
Once all connections have been made, check for loose connections; secure them if you find any.
Summary of Contents for Quatra XR-12000L
Page 51: ...Quatra Full Rise Scissor Lift 51 P N 5900085 Rev A1 October 2019 Wiring Diagrams 5585320 ...
Page 52: ...Quatra Full Rise Scissor Lift 52 P N 5900085 Rev A1 October 2019 5585321 ...
Page 53: ...Quatra Full Rise Scissor Lift 53 P N 5900085 Rev A1 October 2019 Labels ...
Page 54: ...Quatra Full Rise Scissor Lift 54 P N 5900085 Rev A1 October 2019 ...
Page 55: ...Quatra Full Rise Scissor Lift 55 P N 5900085 Rev A1 October 2019 Parts Drawings ...
Page 56: ...Quatra Full Rise Scissor Lift 56 P N 5900085 Rev A1 October 2019 ...
Page 57: ...Quatra Full Rise Scissor Lift 57 P N 5900085 Rev A1 October 2019 ...
Page 58: ...Quatra Full Rise Scissor Lift 58 P N 5900085 Rev A1 October 2019 ...
Page 59: ...Quatra Full Rise Scissor Lift 59 P N 5900085 Rev A1 October 2019 ...
Page 60: ...Quatra Full Rise Scissor Lift 60 P N 5900085 Rev A1 October 2019 ...
Page 61: ...Quatra Full Rise Scissor Lift 61 P N 5900085 Rev A1 October 2019 ...
Page 62: ...Quatra Full Rise Scissor Lift 62 P N 5900085 Rev A1 October 2019 ...
Page 63: ...Quatra Full Rise Scissor Lift 63 P N 5900085 Rev A1 October 2019 ...
Page 64: ...Quatra Full Rise Scissor Lift 64 P N 5900085 Rev A1 October 2019 ...
Page 65: ...Quatra Full Rise Scissor Lift 65 P N 5900085 Rev A1 October 2019 ...
Page 66: ...Quatra Full Rise Scissor Lift 66 P N 5900085 Rev A1 October 2019 ...
Page 67: ...Quatra Full Rise Scissor Lift 67 P N 5900085 Rev A1 October 2019 ...
Page 68: ...Quatra Full Rise Scissor Lift 68 P N 5900085 Rev A1 October 2019 ...
Page 69: ...Quatra Full Rise Scissor Lift 69 P N 5900085 Rev A1 October 2019 ...
Page 70: ...Quatra Full Rise Scissor Lift 70 P N 5900085 Rev A1 October 2019 Maintenance Log ...
Page 71: ...Quatra Full Rise Scissor Lift 71 P N 5900085 Rev A1 October 2019 Maintenance Log ...